TEXAS · WELLS · MIDLAND COUNTY · API 42-329-31288 · DISTRICT 7B

Teinert G. O. #1

Y

Midland County · Bradford Ranch (Atoka) field · Producing  · Vertical

Teinert G. O. #1 (API 42-329-31288) is a well in Midland County operated by Chevron U. S. A. Inc., completed April 16, 1984 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued February 7, 1984, permitted to 11,475 ft.

It was permitted by Texaco Inc. and has since transferred to Chevron U. S. A. Inc. on the wellbore schedule.

Completion filings report 5 formation tops, including San Andres, Spraberry, Strawn, Massive Atoka.

No lease production has been reported under this well’s leases.

Operator of record

Chevron U. S. A. Inc.

Permitted by Texaco Inc.; the EWA schedule now lists a different operator.

Based in
Midland, TX
P-5 status
Active (A)
P-5 last filed
Jan 30, 2026
Permits on file
9,293
Phone
(866) 212-1212

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleChevron U. S. A. Inc.
Production reportsChevron U. S. A. Inc.through Apr 2026
Latest permitTexaco Inc.Feb 7, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,475
total depth, ft
1
permits on file
Feb 7, 1984
last permit issued
Apr 16, 1984
completed
0
cumulative oil, bbl
2.77M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 16, 1984
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Teinert, G. O. G-10-135428Bradford Ranch (Atoka)Chevron U. S. A. Inc.102.77MJan 1993 – Jul 2026
— O-10-28885——000—

Gas, mcf lease total

Last 12 months 16,169 · prior 12 9,329(+73%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Jan 1993 → May 2002
  2. 2Chevron U. S. A. Inc.Jun 2002 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
228585-99DrillTexaco Inc.Feb 21, 1984Feb 7, 1984Mar 4, 198411,495

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 16, 1984Teinert G. O. G-10-135428Bradford Ranch (Atoka)Chevron U. S. A. Inc.Producing11,475
Apr 16, 1984Teinert G. O. O-10-28885Bradford Ranch (Atoka)Texaco E & P Inc.Not on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 2,792 ft elevation.Download CSV →

FormationMD ftSubsea
San Andres4,398-1,606
SpraberryUPPER SPRABERRY7,765-4,973
SpraberryLOWER SPRABERRY8,327-5,535
StrawnLOWER STRAWN10,701-7,909
Massive Atoka10,931-8,139
AtokaATOKA "AB" ZONE11,377-8,585

Perforations

Perforated and open-hole intervals.

FromToType
11,35611,369Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37538017.5450 S
9.6254,50012.251,800 S
79,7808.51,474 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 5, 1990Jul 27, 1990—
00Sep 13, 1990——
00May 11, 1984Apr 30, 1984—
00May 8, 1984Apr 30, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/32931288, documented in the API reference.