TEXAS · WELLS · MIDLAND COUNTY · PARKS FIELD UNIT NO. 2 LEASE · API 42-329-33780 · DISTRICT 7B

Parks Field Unit No. 2 #1421

Shut in

Midland County · Parks (Devonian) field · Temp Abandoned  · Horizontal

Parks Field Unit NO. 2 #1421 (API 42-329-33780) is a horizontal well in Midland County operated by Xto Energy Inc., completed September 5, 1997 and listed as temp abandoned on the RRC schedule, shut in February 1, 2026.

The RRC has issued one drilling permit, issued June 11, 1997, permitted to 15,945 ft.

It was permitted by Mobil Producing TX. & N.M. Inc. and has since transferred to Xto Energy Inc. on the wellbore schedule.

Completion filings report 5 formation tops, including San Andres, Sprby, Strawn, Bend.

Its lease has reported 177K barrels of oil and 8.17M mcf of gas since September 1997, last reporting volume in January 2026.

Operator of record

XTO Energy Inc.

Permitted by Mobil Producing TX. & N.M. Inc.; the EWA schedule now lists a different operator.

Based in
Spring, TX
P-5 status
Active – Extension (X)
P-5 last filed
Apr 8, 2026
Permits on file
16,156
Phone
(346) 502-1572

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleXTO Energy Inc.
Production reportsXTO Energy Inc.through Jan 2026
Latest permitMobil Producing TX. & N.M. Inc.Jun 11, 1997

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

15,945
total depth, ft
1
permits on file
Jun 11, 1997
last permit issued
Sep 5, 1997
completed
177K
cumulative oil, bbl
8.17M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 1997 THROUGH Jan 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 5, 1997
Shut in
Feb 1, 2026
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Parks Field Unit No. 2 G-10-167211Parks (Devonian)XTO Energy Inc.1177K8.17MSep 1997 – Jan 2026

Gas, mcf lease total

Last 12 months 6,346 · prior 12 6,919(-8%)

05K10K15K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mobil Producing TX. & N.M. Inc.Sep 1997 → Dec 2011
  2. 2XTO Energy Inc.Jan 2012 → Jan 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
463573-99DrillMobil Producing TX. & N.M. Inc.Jun 9, 1997Jun 11, 1997Jun 15, 199712,200

Completions

CompletedLeaseFieldOperatorStatusDepth
Sep 5, 1997Parks Field Unit No. 2 G-10-167211Parks (Devonian)XTO Energy Inc.Temp Abandoned · shut in Feb 1, 202615,945

Formation tops

As filed on W-2/G-1. Subsea from 2,792 ft elevation.Download CSV →

FormationMD ftSubsea
San Andres4,680-1,888
Sprby7,790-4,998
Strawn10,210-7,418
Bend10,500-7,708
Devonian11,680-8,888

Perforations

Perforated and open-hole intervals.

FromToType
11,81015,945Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37541017.5445 S
—5,84112.25700 S
9.625—12.251,200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Apr 29, 1998Oct 24, 1997Yes
00Mar 31, 1998——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/32933780, documented in the API reference.