TEXAS · WELLS · MIDLAND COUNTY · LYNCH, JUNE T. LEASE · API 42-329-33849 · DISTRICT 7B

Lynch June T. #5

Shut in

Midland County · Spraberry (Trend Area) field · Shut In  · Vertical

Lynch June T. #5 (API 42-329-33849) is a well in Midland County operated by Apache Corporation, completed September 18, 1997 and listed as shut in on the RRC schedule, shut in May 1, 2020.

The RRC has issued one drilling permit, issued August 1, 1997, permitted to 10,050 ft.

It was permitted by Terrace Petroleum Corporation and has since transferred to Apache Corporation on the wellbore schedule.

Completion filings report 4 formation tops, including Clfk, Sprby, Dean, Wlfcmp.

Its lease has reported 442K barrels of oil and 1.3M mcf of gas since April 1996, last reporting in July 2026. The lease carries 9 wells, so these are lease totals, not this well alone.

Operator of record

Apache Corporation

Permitted by Terrace Petroleum Corporation; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Dec 3, 2025
Permits on file
9,756
Phone
(713) 954-5500

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleApache Corporation
Production reportsApache Corporationthrough Mar 2020
Latest permitTerrace Petroleum CorporationAug 1, 1997

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,050
total depth, ft
1
permits on file
Aug 1, 1997
last permit issued
Sep 18, 1997
completed
442K
cumulative oil, bbl
1.3M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 1996 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 18, 1997
Shut in
May 1, 2020
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 9 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Lynch, June T. O-10-34939Spraberry (Trend Area)Apache Corporation9442K1.3MApr 1996 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Terrace Petroleum CorporationApr 1996 → Nov 1996
  2. 2Arco PermianDec 1996 → Dec 2001
  3. 3BP America Production CompanyJan 2002 → Nov 2010
  4. 4Apache CorporationDec 2010 → Mar 2020

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
465684-99DrillTerrace Petroleum CorporationJul 31, 1997Aug 1, 1997Aug 11, 199710,200

Completions

CompletedLeaseFieldOperatorStatusDepth
Sep 18, 1997Lynch June T. O-10-34939Spraberry (Trend Area)Apache CorporationShut In · shut in May 1, 202010,050

Formation tops

As filed on W-2/G-1. Subsea from 2,891 ft elevation.Download CSV →

FormationMD ftSubsea
Clfk7,385-4,494
Sprby7,848-4,957
Dean9,045-6,154
Wlfcmp9,296-6,405

Perforations

Perforated and open-hole intervals.

FromToType
7,9908,010Perforated
8,6608,680Perforated
9,3709,390Perforated
9,8609,880Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
12.7536014.75175 S
8.6255,13911925 S
5.510,0507.875750 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 12, 1998Oct 9, 1997Yes
00Jan 28, 1998——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/32933849, documented in the API reference.