WELL · 42-329-34007 · DISTRICT 8

TXL S-40 33-1 #1

Plugged

Midland County · Spraberry (Trend Area) field  · Vertical

Txl S-40 33-1 #1 (API 42-329-34007) is a plugged well in Midland County, plugged January 3, 2019, last operated by Encana Oil & Gas(USA) Inc..

The RRC has issued one drilling permit, issued January 22, 1998, permitted to 10,150 ft.

It was permitted by Arco Permian and has since transferred to Encana Oil & Gas(USA) Inc. on the wellbore schedule.

Completion filings report 4 formation tops, including Clear Fork, Spraberry, Dean, Wolfcamp.

Its lease has reported 44.6K barrels of oil and 90.4K mcf of gas since May 1998, last reporting in April 2019.

Operator of record

Encana Oil & Gas(usa) Inc.

Permitted by Arco Permian; the EWA schedule now lists a different operator.

Based in
Denver, CO
P-5 status
Inactive (I)
P-5 last filed
Dec 19, 2019
Permits on file
3,078
Phone
(303) 623-2300

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEncana Oil & Gas(usa) Inc.
Production reportsEncana Oil & Gas(usa) Inc.through Mar 2018
Latest permitArco PermianJan 22, 1998

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,150
total depth, ft
1
permits on file
Jan 22, 1998
last permit issued
May 20, 1998
completed
44.6K
cumulative oil, bbl
90.4K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 1998 THROUGH Apr 2019

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 20, 1998
Shut in
—
Plugged
Jan 3, 2019

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
TXL "S-40" 33-1 O-10-35829Spraberry (Trend Area)Encana Oil & Gas(usa) Inc.144.6K90.4KMay 1998 – Apr 2019

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Arco PermianMay 1998 → Dec 2001
  2. 2BP America Production CompanyJan 2002 → Jun 2003
  3. 3OXY USA WTP LPJul 2003 → Jul 2003
  4. 4Forest Oil CorporationAug 2003 → Dec 2009
  5. 5Sandridge Expl. and Prod., LLCJan 2010 → Sep 2010
  6. 6Athlon Energy Operating LLCOct 2010 → May 2013
  7. 7Encana Oil & Gas(usa) Inc.Mar 2018 → Mar 2018

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
472258-99DrillArco PermianJan 15, 1998Jan 22, 1998Mar 17, 199810,150

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-35829————

Formation tops

As filed on W-2/G-1. Subsea from 2,846 ft elevation.Download CSV →

FormationMD ftSubsea
Clear ForkCLEARFORK7,172-4,326
Spraberry7,670-4,824
Dean8,897-6,051
Wolfcamp9,171-6,325

Perforations

Perforated and open-hole intervals.

FromToType
7,8147,834Perforated
8,5508,570Perforated
9,3449,364Perforated
9,8069,826Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
12.7535014.75240 S
8.6254,85911400 S
4.510,0997.875414 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 31, 1998Jul 30, 1998Yes
00Aug 24, 1998——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/32934007, documented in the API reference.