TEXAS · WELLS · MIDLAND COUNTY · COLLINS, H. S. UNIT LEASE · API 42-329-34077 · DISTRICT 7B

Collins H. S. Unit #3H

Shut in

Midland County · Parks (Devonian) field · Temp Abandoned  · Horizontal

Collins H. S. Unit #3H (API 42-329-34077) is a horizontal well in Midland County operated by Xto Energy Inc., completed June 10, 1998 and listed as temp abandoned on the RRC schedule, shut in June 1, 2020.

The RRC has issued one drilling permit (amended once), issued April 2, 1998, permitted to 11,668 ft.

It was permitted by Mobil Producing TX. & N.M. Inc. and has since transferred to Xto Energy Inc. on the wellbore schedule.

Completion filings report 3 formation tops, including Morrow, Woodford, Devonian.

Its lease has reported 109K barrels of oil and 5.07M mcf of gas since June 1998, with no volume in the three years through April 2026.

Operator of record

XTO Energy Inc.

Permitted by Mobil Producing TX. & N.M. Inc.; the EWA schedule now lists a different operator.

Based in
Spring, TX
P-5 status
Active – Extension (X)
P-5 last filed
Apr 8, 2026
Permits on file
16,156
Phone
(346) 502-1572

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleXTO Energy Inc.
Production reportsXTO Energy Inc.through May 2020
Latest permitMobil Producing TX. & N.M. Inc.Apr 2, 1998

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,668
total depth, ft
2
permits on file
Apr 2, 1998
last permit issued
Jun 10, 1998
completed
109K
cumulative oil, bbl
5.07M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 1998 THROUGH May 2020

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 10, 1998
Shut in
Jun 1, 2020
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Collins, H. S. Unit G-10-169648Parks (Devonian)XTO Energy Inc.1109K5.07MJun 1998 – May 2020

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mobil Producing TX. & N.M. Inc.Jun 1998 → Dec 2011
  2. 2XTO Energy Inc.Jan 2012 → May 2020

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
474969-98DrillMobil Producing TX. & N.M. Inc.Apr 13, 1998Apr 2, 1998Apr 5, 199816,000
474969-99DrillMobil Producing TX. & N.M. Inc.Apr 2, 1998Apr 2, 1998—16,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 10, 1998Collins H. S. Unit G-10-169648Parks (Devonian)XTO Energy Inc.Temp Abandoned · shut in Jun 1, 202011,668

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Morrow10,722
Woodford11,536
Devonian11,640

Perforations

Perforated and open-hole intervals.

FromToType
11,71611,824Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37531017.5360 S
9.6255,00012.251,770 S
711,6688.5450 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Oct 29, 1998Aug 3, 1998Yes
00Sep 8, 1998——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/32934077, documented in the API reference.