TEXAS · WELLS · MIDLAND COUNTY · TIPPETT, JUNE "7A" LEASE · API 42-329-34132 · DISTRICT 7B

Tippett June 7A #1

Plugged

Midland County · Spraberry (Trend Area) field  · Vertical

Tippett June 7a #1 (API 42-329-34132) is a plugged well in Midland County, plugged January 18, 2023, last operated by Apache Corporation.

The RRC has issued one drilling permit, issued November 24, 1998, permitted to 10,150 ft.

It was permitted by Arco Permian and has since transferred to Apache Corporation on the wellbore schedule.

Completion filings report 4 formation tops, including Clfk, Sprby, Dean, Wlfcmp.

Its lease has reported 58.9K barrels of oil and 133K mcf of gas since January 1999, with no volume in the three years through April 2026.

Operator of record

Apache Corporation

Permitted by Arco Permian; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Dec 3, 2025
Permits on file
9,758
Phone
(713) 954-5500

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleApache Corporation
Production reportsApache Corporationthrough Apr 2020
Latest permitArco PermianNov 24, 1998

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,150
total depth, ft
1
permits on file
Nov 24, 1998
last permit issued
Jan 8, 1999
completed
58.9K
cumulative oil, bbl
133K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1999 THROUGH Apr 2020

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 8, 1999
Shut in
—
Plugged
Jan 18, 2023

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Tippett, June "7A" O-10-35950Spraberry (Trend Area)Apache Corporation158.9K133KJan 1999 – Apr 2020

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Arco PermianJan 1999 → Dec 2001
  2. 2BP America Production CompanyJan 2002 → Nov 2010
  3. 3Apache CorporationDec 2010 → Apr 2020

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
481124-99DrillArco PermianNov 24, 1998Nov 24, 1998Dec 14, 199810,150

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 8, 1999Tippett June 7A O-10-35950Spraberry (Trend Area)Apache CorporationPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 2,887 ft elevation.Download CSV →

FormationMD ftSubsea
Clfk7,325-4,438
Sprby7,694-4,807
Dean8,988-6,101
Wlfcmp9,220-6,333

Perforations

Perforated and open-hole intervals.

FromToType
7,9948,010Perforated
8,5608,580Perforated
9,3409,360Perforated
9,7909,810Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
12.7538414.75240 S
8.6255,22211350 S
4.59,9977.8751,071 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Mar 2, 1999Jan 28, 1999Yes
00Feb 18, 1999——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/32934132, documented in the API reference.