TEXAS · WELLS · MIDLAND COUNTY · KOONCE 'A' LEASE · API 42-329-38338 · DISTRICT 7B
Koonce A #3
Midland County · Spraberry (Trend Area) field · Producing · Vertical
- Fields on the latest permit · any of 2
- Horselot (Strawn) · Spraberry (Trend Area)
- Not one formation; the well must be completed in one of them, and no target formation is stated.
Koonce A #3 (API 42-329-38338) is a well in Midland County operated by Diamondback E&P LLC, completed October 4, 2013 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit (amended once), issued November 16, 2012, permitted to 10,965 ft.
It was permitted by Endeavor Energy Resources L.P. and has since transferred to Diamondback E&P LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Spraberry, Wolfcamp, Strawn.
Its lease has reported 203K barrels of oil and 386K mcf of gas since February 2013, last reporting volume in August 2026. The lease carries 4 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Endeavor Energy Resources L.P.; the EWA schedule now lists a different operator.
- Based in
- Midland, TX
- P-5 status
- Active (A)
- P-5 last filed
- May 4, 2026
- Permits on file
- 5,254
- Phone
- (432) 221-7400
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Diamondback E&P LLC |
| Production reports | Diamondback E&P LLCthrough Aug 2026 |
| Latest permit | Endeavor Energy Resources L.P.Nov 16, 2012 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,965
- total depth, ft
- 2
- permits on file
- Nov 16, 2012
- last permit issued
- Oct 4, 2013
- completed
- 203K
- cumulative oil, bbl
- 386K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · FEB 2013 THROUGH AUG 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Oct 4, 2013
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Wells nearby
Every well with a location on file around this well, in any state, nearest first.
Texas locations come from drilling permits, so most older Texas wells have none and are not listed.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH AUG 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 4 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Koonce 'A' O-10-43655 | Spraberry (Trend Area) | Diamondback E&P LLC | 4 | 203K | 386K | Feb 2013 – Aug 2026 |
Oil, barrels lease total
Last 12 months 12,321 · prior 12 8,173(+51%)
Gas, mcf lease total
Last 12 months 25,950 · prior 12 9,698(+168%)
Wells named Koonce A
Diamondback E&P LLC's other wells filed under this lease name in Midland County, newest permit first. The RRC gives a gas well its own lease number, so the name is what joins the wells of a unit.
Loading the lease's wellsChain of custody
Every operator that reported production on this well's lease, in order.
- 1Endeavor Energy Resources L.P.Feb 2013 → Dec 2024
- 2Diamondback E&P LLCJan 2025 → Aug 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 749886-98 | Drill | Endeavor Energy Resources L.P. | Nov 19, 2012 | Nov 16, 2012 | Jul 29, 2013 | 12,000 |
| 749886-99 | Drill | Endeavor Energy Resources L.P. | Oct 15, 2012 | Nov 16, 2012 | — | 12,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Oct 4, 2013 | Koonce A O-10-43655 | Spraberry (Trend Area) | Diamondback E&P LLC | Producing | 10,965 |
Formation tops
As filed on W-2/G-1. Subsea from 2,762 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,402 | 10,830 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 330 | 17.5 | 315 S |
| 8.625 | 5,502 | 11 | 665 S |
| 5.5 | 10,965 | 7.875 | 1,120 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 10, 2014 | May 14, 2014 | Yes |
Well logs
1 log loaded from the RRC's log index, the latest received Sep 19, 2016. Neutron. These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.
Open the RRC's log search for this well ↗| Logas described | Files | Intervalft, as filed | Datereceived | SizeMB |
|---|---|---|---|---|
| NEUTRON POROSITYSpans Spraberry, Wolfcamp, Strawn | TIFF | 6,500 to 10,944 | Sep 19, 2016run Aug 22, 2013 | 2.69 |
"Spans" is by this well's own filed formation tops: a formation runs from its top to the next deeper top filed, and the deepest runs to the bottom of the log. Depths are measured along the wellbore, so on a horizontal the lateral counts in the formation it was landed in.
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-329-38338 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-329-38338 → scanned completion filings
The logs loaded for this well are under Well logs, with the RRC's log search for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/32938338, documented in the API reference.