TEXAS · WELLS · MITCHELL COUNTY · API 42-335-31232 · DISTRICT 08

Stubblefield, Frankie #11 WIW

N

Mitchell County  · Vertical

Stubblefield, Frankie #11 WIW (API 42-335-31232) is a former disposal or injection well in Mitchell County, last operated by Sun Exploration & Production CO.; its UIC permit is no longer active.

The RRC has issued one drilling permit, issued November 1, 1977, permitted to 6,450 ft.

Operator of record

Sun Exploration & Production Co.

Based in
Dallas, TX
P-5 status
Inactive (I)
P-5 last filed
Nov 23, 1988
Permits on file
1,284
Phone
(214) 890-6205

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitSun Exploration & Production Co.Nov 1, 1977
6,450
total depth, ft
1
permits on file
Nov 1, 1977
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
11168-99DrillSun Exploration & Production Co.Nov 1, 1977Nov 1, 1977—6,450

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
—
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000123291H-1 InjectionCanceled Jun 16, 20209001,2006,000–6,200

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/33531232, documented in the API reference.