TEXAS · WELLS · MITCHELL COUNTY · API 42-335-31494 · DISTRICT 7B

Coleman Ranch Unit #302

Plugged

Mitchell County · Coleman Ranch field  · Vertical

Coleman Ranch Unit #302 (API 42-335-31494) is a plugged well in Mitchell County, plugged August 24, 1983, last operated by Americo Energy Resources LLC.

The RRC has issued one drilling permit, issued June 21, 1979, permitted to 2,950 ft.

It was permitted by American Petrofina CO. Of Tex. and has since transferred to Americo Energy Resources LLC on the wellbore schedule.

Operator of record

Americo Energy Resources LLC

Permitted by American Petrofina Co. of Tex.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Dec 29, 2025
Permits on file
80
Phone
(713) 984-9700

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAmerico Energy Resources LLC
Production reportsnone
Latest permitAmerican Petrofina Co. of Tex.Jun 21, 1979

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,950
total depth, ft
1
permits on file
Jun 21, 1979
last permit issued
Jul 14, 1979
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 14, 1979
Shut in
—
Plugged
Aug 24, 1983

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
51475-99DrillAmerican Petrofina Co. of Tex.Jun 21, 1979Jun 21, 1979—2,950

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 14, 1979Coleman Ranch Unit O-10-23672Coleman RanchAmerico Energy Resources LLCPlugged—

Perforations

Perforated and open-hole intervals.

FromToType
2,6562,840Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3753016—
2.3752,848——
4.52,9456.25900 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984Jul 26, 1979—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
—
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000042248H-1 InjectionPlugged Sep 1, 19836001,2002,656–2,840

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/33531494, documented in the API reference.