WELL · 42-335-33660 · DISTRICT 7
Wallace A #2
Mitchell County · Silvercreek (Strawn Lime) field · Vertical
Wallace A #2 (API 42-335-33660) is a plugged well in Mitchell County, plugged April 25, 2002, last operated by Smith Pipe Of Abilene.
The RRC has issued one drilling permit (amended once), issued February 23, 1994, permitted to 8,000 ft.
It was permitted by Tdc Engineering, Inc. and has since transferred to Smith Pipe Of Abilene on the wellbore schedule.
Completion filings report 2 formation tops, including Odom, Ellenburger.
Its lease has reported 40.6K barrels of oil and 120K mcf of gas since April 1994, last reporting in July 2026.
Operator of record
Permitted by TDC Engineering, Inc.; the EWA schedule now lists a different operator.
- Based in
- Abilene, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Aug 29, 2014
- Phone
- (325) 692-3903
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Smith Pipe of Abilene |
| Production reports | TDC Engineering, Inc.through Apr 1998 |
| Latest permit | TDC Engineering, Inc.Feb 23, 1994 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,000
- total depth, ft
- 2
- permits on file
- Feb 23, 1994
- last permit issued
- Apr 10, 1994
- completed
- 40.6K
- cumulative oil, bbl
- 120K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 1994 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 10, 1994
- Shut in
- —
- Plugged
- Apr 25, 2002
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Wallace "A" O-8-27188 | Silvercreek (Strawn Lime) | Smith Pipe of Abilene | 1 | 40.6K | 120K | Apr 1994 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1TDC Engineering, Inc.Apr 1994 → Apr 1998
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 421420-98 | Drill | TDC Engineering, Inc. | Jun 9, 1994 | Feb 23, 1994 | — | 8,000 |
| 421420-99 | Drill | TDC Engineering, Inc. | Feb 23, 1994 | Feb 23, 1994 | Mar 10, 1994 | 8,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-27188 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,269 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Odom | 6,970 | -4,701 |
| Ellenburger | 7,250 | -4,981 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,972 | 6,987 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 507 | 12.25 | 380 S |
| 5 | 7,384 | 7.625 | 160 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 14, 1994 | May 20, 1994 | Yes |
| 00 | Jun 17, 1994 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-335-33660 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-335-33660 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/33533660, documented in the API reference.