WELL · 42-335-34188 · DISTRICT 8

Watson W. W. #74W

Y

Mitchell County · Iatan East Howard field · Injection  · Vertical

Watson W. W. #74W (API 42-335-34188) is a well in Mitchell County operated by Basa Resources Inc., completed January 10, 2003 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued September 26, 2000, permitted to 3,410 ft.

It was permitted by Crownquest Operating, LLC and has since transferred to Basa Resources Inc. on the wellbore schedule.

Its lease has reported 1.3M barrels of oil and 148K mcf of gas since January 1993, last reporting in July 2026. The lease carries 75 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 351 barrels injected in the 12 months reported through December 2025.

Operator of record

Basa Resources Inc.

Permitted by Crownquest Operating, LLC; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Active (A)
P-5 last filed
Feb 12, 2026
Permits on file
472
Phone
(214) 580-5206

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBasa Resources Inc.
Production reportsBasa Resources, Inc.through Apr 2026
Latest permitCrownquest Operating, LLCSep 26, 2000

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,410
total depth, ft
1
permits on file
Sep 26, 2000
last permit issued
Jan 10, 2003
completed
1.3M
cumulative oil, bbl
148K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 10, 2003
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 75 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Watson, W. W. O-10-2891Iatan, East HowardBasa Resources, Inc.751.3M148KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 18,568 · prior 12 19,264(-4%)

01K2K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Parker & Parsley Development Co.Jan 1993 → Feb 1995
  2. 2Parker & Parsley Development L.PMar 1995 → Aug 1997
  3. 3Pioneer Natural Res. USA, Inc.Sep 1997 → Sep 1999
  4. 4Crownquest Operating, LLCOct 1999 → Mar 2011
  5. 5BC Operating, Inc.Aug 2001 → Oct 2002
  6. 6Basa Resources, Inc.Apr 2011 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
500090-99DrillCrownquest Operating, LLCSep 26, 2000Sep 26, 2000Nov 10, 20003,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 10, 2003Watson W. W. O-10-2891Iatan East HowardBasa Resources Inc.Injection3,410

Perforations

Perforated and open-hole intervals.

FromToType
2,6632,896Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62530712.25125 S
4.53,4107.875925 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 22, 2003Feb 5, 2003Yes
00Mar 11, 2003——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

351
bbl, last 12 reported months
514K
bbl, all reported
Dec 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000090618H-1 InjectionActive1,0001,2002,429–3,350

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 351 · prior 12 337(+4%)

0204020242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/33534188, documented in the API reference.