WELL · 42-335-34263 · DISTRICT 8
Scott 12 #1X
Mitchell County · Vertical
Scott 12 #1X (API 42-335-34263) is a plugged well in Mitchell County, plugged June 27, 2002, last operated by Bright & CO..
The RRC has issued 2 drilling permits between 2002 and 2009, permitted to 7,000 ft.
Completion filings report 6 formation tops, including Rustler, Yates, Seven Rivers, Queen.
Its lease has reported 53.5K barrels of oil since January 2010, last reporting in July 2026.
Operator of record
The Colony, TX · P-5 Y, filed Nov 4, 2016 · 407 permits on file · (214) 729-6413
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Kek Exploration LLCthrough Apr 2026 |
| Latest permit | Bright & Co.Sep 23, 2009 |
- 7,000
- total depth, ft
- 2
- permits on file
- Sep 23, 2009
- last permit issued
- —
- completed
- 53.5K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 2010 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Jun 27, 2002
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Scott 12 O-10-39977 | Walter (Wolfcamp) | Kek Exploration LLC | 1 | 53.5K | 0 | Jan 2010 – Jul 2026 |
Oil, barrels lease total
Last 12 months 933 · prior 12 892(+5%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Bright & Co.Jan 2010 → Feb 2012
- 2PPC Operating Company LLCMar 2012 → Nov 2017
- 3Relentless Permian Operating LLCFeb 2018 → Dec 2022
- 4New Height Energy, LLCJan 2023 → Apr 2025
- 5Kek Exploration LLCMay 2025 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 685419-99 | Reenter | Bright & Co. | Sep 23, 2009 | Sep 23, 2009 | Sep 25, 2009 | 7,000 |
| 520927-99 | Drill | Bright & Co. | Jun 12, 2002 | Jun 12, 2002 | Jun 15, 2002 | 7,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-39977 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,320 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Rustler | 800 | 1,520 |
| Yates | 920 | 1,400 |
| Seven Rivers7-RIVERS | 1,050 | 1,270 |
| Queen | 1,440 | 880 |
| L Wolfcamp | 6,406 | -4,086 |
| L. Wolfcamp | 6,406 | -4,086 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,544 | 6,600 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 166 | 17.5 | 200 S |
| 8.625 | 2,019 | 11 | 875 S |
| 4.5 | 6,765 | 7.875 | 525 S |
| 4.5 | — | 7.875 | 350 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 16, 2013 | May 7, 2012 | — |
| 00 | Jul 27, 2010 | Feb 9, 2010 | Yes |
| 00 | Jun 25, 2010 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-335-34263 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-335-34263 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/33534263, documented in the API reference.