TEXAS · WELLS · MONTAGUE COUNTY · CORPENING LEASE · API 42-337-00554 · DISTRICT 7C
Corpening #2
Montague County · Chapman-McFarlin (Ellen. 6900) field · Vertical
Corpening #2 (API 42-337-00554) is a plugged well in Montague County, plugged January 28, 1994, last operated by Walsh & Watts Inc..
The RRC has issued one drilling permit, issued November 13, 1984, permitted to 7,200 ft.
Completion filings report 4 formation tops, including Viola, Simpson, Oil Creek, Ellenburger.
Its lease has reported 933 barrels of oil and 661 mcf of gas since January 1993, last reporting in March 1994.
Operator of record
- Based in
- Aledo, TX
- P-5 status
- Active (A)
- P-5 last filed
- Dec 2, 2025
- Permits on file
- 361
- Phone
- (469) 428-3381
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Walsh & Watts Inc. |
| Production reports | Walsh & Watts, Inc.through Jan 1994 |
| Latest permit | Walsh & Watts, Inc.Nov 13, 1984 |
- 7,200
- total depth, ft
- 1
- permits on file
- Nov 13, 1984
- last permit issued
- Dec 14, 1984
- completed
- 933
- cumulative oil, bbl
- 661
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 1994
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 14, 1984
- Shut in
- —
- Plugged
- Jan 28, 1994
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Corpening O-13-24940 | Chapman-McFarlin (Ellen. 6900) | Walsh & Watts, Inc. | 1 | 933 | 661 | Jan 1993 – Mar 1994 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Walsh & Watts, Inc.Jan 1993 → Jan 1994
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 257738-99 | Recompletion | Walsh & Watts, Inc. | Nov 12, 1984 | Nov 13, 1984 | — | 7,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Dec 14, 1984 | Corpening O-13-24940 | Chapman-McFarlin (Ellen. 6900) | Walsh & Watts Inc. | Plugged | — |
| — | Corpening O-13-4421 | Chapman-McFarlin | Walsh & Watts Inc. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 917 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Viola | 6,226 | -5,309 |
| Simpson | 6,519 | -5,602 |
| Oil Creek | 6,644 | -5,727 |
| EllenburgerELLENBERGER | 6,760 | -5,843 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,760 | 6,767 | Perforated |
| — | 4,862 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 612 | 13.75 | 400 S |
| 7 | 6,171 | 9 | 500 S |
| 4.5 | 6,920 | 6.25 | 150 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 11, 1985 | Dec 19, 1984 | — |
| 00 | Jan 5, 1985 | — | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-337-00554 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-337-00554 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/33700554, documented in the API reference.