TEXAS · WELLS · MONTAGUE COUNTY · API 42-337-03386 · DISTRICT 7C
Minor #1
Montague County · Minor (Strawn) field · Vertical
Minor #1 (API 42-337-03386) is a plugged well in Montague County, plugged October 8, 2015, last operated by Walsh & Watts Inc..
The RRC has issued one drilling permit, issued January 27, 1994, permitted to 7,322 ft.
Completion filings report 3 formation tops, including Strawn, Viola, Ellenburger.
Its 2 leases have reported 8.92K barrels of oil and 11K mcf of gas since January 1993, last reporting in January 2016. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- Aledo, TX
- P-5 status
- Active (A)
- P-5 last filed
- Dec 2, 2025
- Permits on file
- 361
- Phone
- (469) 428-3381
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Walsh & Watts Inc. |
| Production reports | Walsh & Watts, Inc.through Jun 2015 |
| Latest permit | Walsh & Watts, Inc.Jan 27, 1994 |
- 7,322
- total depth, ft
- 1
- permits on file
- Jan 27, 1994
- last permit issued
- Jan 4, 1994
- completed
- 8.92K
- cumulative oil, bbl
- 11K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 2016
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 4, 1994
- Shut in
- —
- Plugged
- Oct 8, 2015
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Minor O-13-28714 | Minor (Strawn) | Walsh & Watts, Inc. | 1 | 7.59K | 10.3K | Jan 1994 – Jan 2016 |
| Minor O-13-15901 | Minor (Ellenburger) | Walsh & Watts, Inc. | 1 | 1.33K | 716 | Jan 1993 – Mar 1994 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Walsh & Watts, Inc.Jan 1993 → Dec 2013
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 420363-99 | Recompletion | Walsh & Watts, Inc. | Jan 20, 1994 | Jan 27, 1994 | Nov 15, 1994 | 7,322 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jan 4, 1994 | Minor O-13-28714 | Minor (Strawn) | Walsh & Watts Inc. | Plugged | — |
| Dec 19, 1968 | Minor O-13-15901 | Minor (Ellenburger) | Walsh & Watts Inc. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,066 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Strawn | 4,863 | -3,797 |
| Viola | 6,590 | -5,524 |
| EllenburgerELLENBERGER | 7,144 | -6,078 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,863 | 4,873 | Perforated |
| — | 7,268 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 682 | 13.5 | 400 S |
| 10.75 | 683 | 13.5 | 400 S |
| 7 | 6,300 | 9 | 200 S |
| 4.5 | 7,311 | 6.125 | 150 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 21, 1994 | Jan 18, 1994 | Yes |
| 00 | Feb 1, 1994 | — | — |
| 00 | Jan 12, 1984 | Jan 17, 1969 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-337-03386 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-337-03386 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/33703386, documented in the API reference.