TEXAS · WELLS · MONTAGUE COUNTY · HILL LEASE · API 42-337-32372 · DISTRICT 7C

Hill #2

Shut in

Montague County · Gwe (Caddo Congl.) field · Shut In  · Vertical

Hill #2 (API 42-337-32372) is a well in Montague County operated by Eagleridge Operating LLC, completed March 6, 1985 and listed as shut in on the RRC schedule, shut in August 1, 2016.

The RRC has issued one drilling permit, issued June 25, 1984, permitted to 6,718 ft.

It was permitted by Biffle, Jimmy Jack and has since transferred to Eagleridge Operating LLC on the wellbore schedule.

Completion filings report one formation top, including Caddo.

Its lease has reported 18.8K barrels of oil and 19 mcf of gas since January 1993, with no volume in the three years through April 2026.

Operator of record

Eagleridge Operating LLC

Permitted by Biffle, Jimmy Jack; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Active – Extension (X)
P-5 last filed
Apr 8, 2026
Permits on file
129
Phone
(214) 295-6704

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEagleridge Operating LLC
Production reportsEagleridge Operating, LLCthrough Jul 2016
Latest permitBiffle, Jimmy JackJun 25, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,718
total depth, ft
1
permits on file
Jun 25, 1984
last permit issued
Mar 6, 1985
completed
18.8K
cumulative oil, bbl
19
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2016

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 6, 1985
Shut in
Aug 1, 2016
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hill O-13-25179Gwe (Caddo Congl.)Eagleridge Operating, LLC118.8K19Jan 1993 – Jul 2016

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Biffle, Jimmy JackJan 1993 → May 1997
  2. 2Mountain Creek Oil Company, Inc.Jun 1997 → Jan 2001
  3. 3Hane Operating, Inc.Feb 2001 → Jul 2005
  4. 4Window Operating Co., TheAug 2005 → Sep 2007
  5. 5Raven Operating Group, Inc.Oct 2007 → Jan 2010
  6. 6Ropa Exploration Corp.Feb 2010 → Dec 2010
  7. 7Excel Oil & Gas, Inc.Jan 2011 → Apr 2012
  8. 8WBH Energy Partners LLCMay 2012 → Feb 2015
  9. 9U.S. Energy Development CorpMar 2015 → Jul 2016

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
243105-99DrillBiffle, Jimmy JackMar 25, 1985Jun 25, 1984—6,750

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 6, 1985Hill O-13-25179Gwe (Caddo Congl.)Eagleridge Operating LLCShut In · shut in Aug 1, 20166,718

Formation tops

As filed on W-2/G-1. Subsea from 895 ft elevation.Download CSV →

FormationMD ftSubsea
Caddo6,455-5,560

Perforations

Perforated and open-hole intervals.

FromToType
6,4666,470Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62573812.25445 S
4.56,6737.875300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Apr 12, 1985Mar 15, 1985—
00Apr 5, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/33732372, documented in the API reference.