WELL · 42-337-32486 · DISTRICT 9

Cady Unit #2

Plugged

Montague County · Shirley (Caddo Congl.) field  · Vertical

Cady Unit #2 (API 42-337-32486) is a plugged well in Montague County, plugged April 17, 2025, last operated by Stephens & Johnson Operating CO..

The RRC has issued one drilling permit, issued January 10, 1985, permitted to 7,000 ft.

It was permitted by Clark,Gene,JR.,Operating Company and has since transferred to Stephens & Johnson Operating CO. on the wellbore schedule.

Completion filings report 2 formation tops, including Strawn, Caddo.

Its 2 leases have reported 151K barrels of oil and 217K mcf of gas since January 1993, last reporting in July 2026. The leases carry 9 wells, so these are lease totals, not this well alone.

Operator of record

Stephens & Johnson Operating Co.

Permitted by Clark,gene,jr.,operating Company; the EWA schedule now lists a different operator.

Based in
Wichita Falls, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jul 2, 2026
Permits on file
360
Phone
(940) 723-2166

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleStephens & Johnson Operating Co.
Production reportsStephens & Johnson Operating Co.through Apr 2026
Latest permitClark,gene,jr.,operating CompanyJan 10, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,000
total depth, ft
1
permits on file
Jan 10, 1985
last permit issued
May 28, 1993
completed
151K
cumulative oil, bbl
217K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 28, 1993
Shut in
—
Plugged
Apr 17, 2025

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 9 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Cady Unit O-13-28491Shirley (Caddo Congl.)Stephens & Johnson Operating Co.7151K216KFeb 1993 – Jul 2026
Wheeler O-13-25081Shirley (Caddo Congl.)S & J Operating Co.2183777Jan 1993 – Jun 1993

Oil, barrels lease total

Last 12 months 453 · prior 12 437(+4%)

050100202420252026

Gas, mcf lease total

Last 12 months 0 · prior 12 0

050100202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1S & J Operating Co.Jan 1993 → Aug 1993
  2. 2Stephens & Johnson Operating Co.Sep 1993 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
263775-99DrillClark,gene,jr.,operating CompanyJan 7, 1985Jan 10, 1985—7,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-25081————
—— O-13-28491————

Formation tops

As filed on W-2/G-1. Subsea from 1,045 ft elevation.Download CSV →

FormationMD ftSubsea
StrawnSTRAWN SAND3,793-2,748
StrawnSTRAWN SAND4,824-3,779
CaddoCADDO CONGL.6,014-4,969
CaddoCADDO. CONGL.6,014-4,969

Perforations

Perforated and open-hole intervals.

FromToType
3,7933,835Perforated
6,0146,018Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62551512.25415 S
5.54,0267.875400 S
4.56,2357.875175 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 2, 2011Jan 3, 2011—
00Jul 9, 1993Jun 23, 1993—
00Feb 16, 1993Apr 1, 1985—
00Apr 15, 1985Apr 1, 1985—
00Apr 12, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/33732486, documented in the API reference.