WELL · 42-337-33583 · DISTRICT 9

Braman #16

Shut in

Montague County · Montague County Regular field · Shut IN  · Vertical

Braman #16 (API 42-337-33583) is a well in Montague County operated by Peba Oil & Gas Inc., completed January 6, 2004 and listed as shut in on the RRC schedule, shut in November 1, 2009.

The RRC has issued one drilling permit (amended twice), issued October 20, 2003, permitted to 2,129 ft.

It was permitted by Peba Oil & Gas CO. and has since transferred to Peba Oil & Gas Inc. on the wellbore schedule.

Completion filings report one formation top, including 1700' Sd.

Its lease has reported 969 barrels of oil and 16 mcf of gas since September 2003, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

Peba Oil & Gas Inc.

Permitted by Peba Oil & Gas Co.; the EWA schedule now lists a different operator.

Based in
Nocona, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 5, 2026
Permits on file
19
Phone
(940) 825-4825

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePeba Oil & Gas Inc.
Production reportsPeba Oil & Gas Co.through Feb 2009
Latest permitPeba Oil & Gas Co.Oct 20, 2003

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,129
total depth, ft
3
permits on file
Oct 20, 2003
last permit issued
Jan 6, 2004
completed
969
cumulative oil, bbl
16
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 2003 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 6, 2004
Shut in
Nov 1, 2009
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Braman O-13-30231Montague County RegularPeba Oil & Gas, Inc.296916Sep 2003 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Peba Oil & Gas Co.Sep 2003 → Feb 2009

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
537673-97DrillPeba Oil & Gas Co.May 11, 2004Oct 20, 2003—2,150
537673-98DrillPeba Oil & Gas Co.Feb 9, 2004Oct 20, 2003—2,150
537673-99DrillPeba Oil & Gas Co.Oct 20, 2003Oct 20, 2003—2,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 6, 2004Braman O-13-30231Montague County RegularPeba Oil & Gas Inc.Shut IN · shut in Nov 1, 20092,129

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
1700' SD1,778

Perforations

Perforated and open-hole intervals.

FromToType
1,7781,782Perforated
1,7881,794Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.52,1127.875225 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 28, 2004Jan 20, 2004Yes
00Oct 20, 2004——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Jul 2014
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000099771H-1 InjectionNot activated2008601,778–1,794

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120132014

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/33733583, documented in the API reference.