TEXAS · WELLS · MONTAGUE COUNTY · API 42-337-34421 · DISTRICT 7C
Doyle Lynch A #1HR
Montague County · Newark East (Barnett Shale) field · Temp Abandoned · Horizontal
Doyle Lynch A #1HR (API 42-337-34421) is a horizontal well in Montague County operated by Scout Energy Management LLC, completed January 27, 2011 and listed as temp abandoned on the RRC schedule, shut in November 1, 2014.
The RRC has issued one drilling permit (amended once), issued September 27, 2010, permitted to 7,561 ft.
It was permitted by Pioneer Natural Res. USA, Inc. and has since transferred to Scout Energy Management LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Marble Falls, Forestburg, Barnett.
Its 2 leases have reported 25.1K barrels of oil and 464K mcf of gas since January 2011, with no volume in the three years through April 2026. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Pioneer Natural Res. USA, Inc.; the EWA schedule now lists a different operator.
- Based in
- Dallas, TX
- P-5 status
- Active (A)
- P-5 last filed
- Sep 22, 2025
- Permits on file
- 483
- Phone
- (972) 277-1397
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Scout Energy Management LLC |
| Production reports | Scout Energy Management LLCthrough Feb 2019 |
| Latest permit | Pioneer Natural Res. USA, Inc.Sep 27, 2010 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,561
- total depth, ft
- 2
- permits on file
- Sep 27, 2010
- last permit issued
- Jan 27, 2011
- completed
- 25.1K
- cumulative oil, bbl
- 464K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 2011 THROUGH Feb 2019
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jan 27, 2011
- Shut in
- Nov 1, 2014
- Plugged
- —
Operator's P-5 on the schedule: Active – Extension (X)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Doyle Lynch A G-13-263838 | Newark, East (Barnett Shale) | Scout Energy Management LLC | 1 | 14.9K | 410K | Jan 2011 – Feb 2019 |
| Doyle Lynch A O-13-31838 | Newark, East (Barnett Shale) | Pioneer Natural Res. USA, Inc. | 1 | 10.2K | 53.6K | Jan 2011 – Aug 2011 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Pioneer Natural Res. USA, Inc.Jan 2011 → Oct 2014
- 2Fuse Energy, LLCJan 2015 → Oct 2016
- 3Scout Energy Management LLCFeb 2019 → Feb 2019
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 702719-98 | Drill | Pioneer Natural Res. USA, Inc. | Apr 12, 2011 | Sep 27, 2010 | Nov 27, 2010 | 7,575 |
| 702719-99 | Drill | Pioneer Natural Res. USA, Inc. | Sep 23, 2010 | Sep 27, 2010 | Sep 29, 2010 | 7,575 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jan 27, 2011 | Doyle Lynch A G-13-263838 | Newark East (Barnett Shale) | Scout Energy Management LLC | Temp Abandoned · shut in Nov 1, 2014 | 7,561 |
| Jan 27, 2011 | Doyle Lynch A O-13-31838 | Newark East (Barnett Shale) | Pioneer Natural Res. USA Inc. | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 851 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Marble Falls | 6,642 | -5,791 |
| Forestburg | 6,859 | -6,008 |
| BarnettLOWER BARNETT | 7,389 | -6,538 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,600 | 7,603 | Perforated |
| 7,600 | 11,503 | Perforated |
| 7,650 | 7,653 | Perforated |
| 7,700 | 7,703 | Perforated |
| 7,750 | 7,753 | Perforated |
| 7,800 | 7,803 | Perforated |
| 7,850 | 7,853 | Perforated |
| 7,900 | 7,903 | Perforated |
| 7,950 | 7,953 | Perforated |
| 8,000 | 8,003 | Perforated |
| 8,050 | 8,053 | Perforated |
| 8,100 | 8,103 | Perforated |
| 8,150 | 8,153 | Perforated |
| 8,200 | 8,203 | Perforated |
| 8,250 | 8,253 | Perforated |
| 8,300 | 8,303 | Perforated |
| 8,350 | 8,353 | Perforated |
| 8,400 | 8,403 | Perforated |
| 8,450 | 8,453 | Perforated |
| 8,500 | 8,503 | Perforated |
| 8,550 | 8,553 | Perforated |
| 8,600 | 8,603 | Perforated |
| 8,650 | 8,653 | Perforated |
| 8,700 | 8,703 | Perforated |
| 8,750 | 8,753 | Perforated |
| 8,800 | 8,803 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 836 | 12.25 | 350 S |
| 5.5 | 11,560 | 8.75 | 1,280 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 20, 2012 | Jan 11, 2012 | — |
| 00 | Aug 16, 2011 | Mar 1, 2011 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-337-34421 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-337-34421 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/33734421, documented in the API reference.