WELL · 42-337-35272 · DISTRICT 9

Lewis-Stuart C4 Unit #4

Y

Montague County · Newark East (Barnett Shale) field · Producing  · Horizontal

Lewis-Stuart C4 Unit #4 (API 42-337-35272) is a horizontal well in Montague County operated by Eagleridge Operating LLC, completed July 19, 2014 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued December 20, 2013, permitted to 9,000 ft.

It was permitted by Wbh Energy Partners LLC and has since transferred to Eagleridge Operating LLC on the wellbore schedule.

Completion filings report 10 formation tops, including Permian (undifferentiated), Cisco, Canyon, Palo Pinto.

Its lease has reported 17K barrels of oil and 907K mcf of gas since July 2014, last reporting in July 2026.

Operator of record

Eagleridge Operating LLC

Permitted by WBH Energy Partners LLC; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed Jan 4, 2026 · 129 permits on file · (855) 820-6008

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEagleridge Operating LLC
Production reportsEagleridge Operating, LLCthrough Apr 2026
Latest permitWBH Energy Partners LLCDec 20, 2013

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,000
total depth, ft
2
permits on file
Dec 20, 2013
last permit issued
Jul 19, 2014
completed
17K
cumulative oil, bbl
907K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 2014 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 19, 2014
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Lewis-Stuart C4 Unit O-13-33531Newark, East (Barnett Shale)Eagleridge Operating, LLC117K907KJul 2014 – Jul 2026

Gas, mcf lease total

Last 12 months 50,473 · prior 12 43,871(+15%)

02K4K6K202420252026

Oil, barrels lease total

Last 12 months 999 · prior 12 748(+34%)

050100150202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1U.S. Energy Development CorpJul 2014 → Oct 2017
  2. 2Eagleridge Operating, LLCNov 2017 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
776114-98DrillWBH Energy Partners LLCJun 3, 2014Dec 20, 2013Jan 23, 20149,000
776114-99DrillWBH Energy Partners LLCDec 20, 2013Dec 20, 2013Jan 23, 20149,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-33531————

Formation tops

As filed on W-2/G-1. Subsea from 1,086 ft elevation.Download CSV →

FormationMD ftSubsea
Permian (undifferentiated)PERMIAN1,06026
Cisco1,181-95
CanyonCANYON SAND1,332-246
Palo Pinto1,990-904
Strawn2,182-1,096
Undetermined - Gas Producing Zon3,072-1,986
Brazos River3,794-2,708
BrysonBRYSON SAND4,517-3,431
Conglomerate6,150-5,064
AtokaATOKA CONGLOMERATE——

Perforations

Perforated and open-hole intervals.

FromToType
7,47112,041Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62592212.25375 S
5.512,2698.75640 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 18, 2016Jun 8, 2016Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/33735272, documented in the API reference.