WELL · 42-337-83150 · DISTRICT 9

Phillips-Custers #1

Y

Montague County · Bowers (Granite Wash) field · Producing  · Vertical

Phillips-Custers #1 (API 42-337-83150) is a well in Montague County operated by Lamar Energy, completed December 15, 1992 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued December 15, 1992, permitted to 3,480 ft.

It was permitted by Cholla Petroleum, Inc. and has since transferred to Lamar Energy on the wellbore schedule.

Completion filings report one formation top, including Rich Sand.

Its 2 leases have reported 287K barrels of oil and 65 mcf of gas since January 1993, last reporting in July 2026. The leases carry 6 wells, so these are lease totals, not this well alone.

Operator of record

Lamar Energy

Permitted by Cholla Petroleum, Inc.; the EWA schedule now lists a different operator.

Based in
Nocona, TX
P-5 status
Active (A)
P-5 last filed
May 6, 2026
Phone
(940) 841-0864

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCholla Petroleum Inc.
Production reportsLamar Energythrough Apr 2026
Latest permitCholla Petroleum, Inc.Dec 15, 1992

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,480
total depth, ft
1
permits on file
Dec 15, 1992
last permit issued
Dec 15, 1992
completed
287K
cumulative oil, bbl
65
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 15, 1992
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 6 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Phillips-Custers O-13-29436Bowers (Granite Wash)Lamar Energy4262K0Nov 1997 – Jul 2026
Phillips-Custers O-13-27902Bowers (Rich Sand)Cholla Petroleum, Inc.225K65Jan 1993 – Sep 1998

Oil, barrels lease total

Last 12 months 2,297 · prior 12 2,122(+8%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Cholla Petroleum, Inc.Jan 1993 → Nov 2024
  2. 2Lamar EnergyDec 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
407269-99RecompletionCholla Petroleum, Inc.Dec 15, 1992Dec 15, 1992Dec 16, 19923,470

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 15, 1992Phillips-Custers O-13-29436Bowers (Granite Wash)Lamar EnergyProducing3,480
Dec 15, 1992Phillips-Custers O-13-27902Bowers (Rich Sand)Cholla Petroleum Inc.Not on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 954 ft elevation.Download CSV →

FormationMD ftSubsea
Rich Sand3,429-2,475

Perforations

Perforated and open-hole intervals.

FromToType
3,4293,480Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
1072——
4.53,3907330 S
73,4298.75190 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 9, 1998Sep 21, 1993—
00Aug 1, 1994Sep 21, 1993—
00Nov 10, 1993Dec 23, 1992—
00Oct 15, 1993——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/33783150, documented in the API reference.