TEXAS · WELLS · MONTGOMERY COUNTY · KEYSTONE MILLS CO. LEASE · API 42-339-30635 · DISTRICT 03

Keystone Mills Co. #2074

Shut in

Montgomery County · Conroe (Middle Wilcox Cons.) field · Temp Abandoned  · Vertical

Keystone Mills CO. #2074 (API 42-339-30635) is a well in Montgomery County operated by Highmark Energy Operating LLC, completed June 2, 1984 and listed as temp abandoned on the RRC schedule, shut in November 1, 2024.

The RRC has issued 2 drilling permits in 1984, permitted to 9,730 ft.

It was permitted by Exxon Corp. and has since transferred to Highmark Energy Operating LLC on the wellbore schedule.

Completion filings report 4 formation tops, including 1st Upper Cockfield, 2nd Upper Cockfield, 1st Main, Wilcox.

No lease production has been reported under this well’s leases.

Operator of record

Highmark Energy Operating LLC

Permitted by Exxon Corp.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Mar 9, 2026
Permits on file
23
Phone
(469) 214-5299

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsDenbury Onshore, LLCthrough Oct 2024
Latest permitExxon Corp.Feb 7, 1984
9,730
total depth, ft
2
permits on file
Feb 7, 1984
last permit issued
Jun 2, 1984
completed
0
cumulative oil, bbl
6.18M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 2, 1984
Shut in
Nov 1, 2024
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Keystone Mills Co. G-3-111707Conroe (Wilcox 9600)Highmark Energy Operating, LLC106.18MJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 0 · prior 12 11,651(-100%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → Mar 2000
  2. 2Exxon Mobil CorporationApr 2000 → Aug 2006
  3. 3Wapiti Operating, LLCSep 2006 → Dec 2009
  4. 4Denbury Onshore, LLCJan 2010 → Oct 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
228679-99DrillExxon Corp.May 16, 1984Feb 7, 1984—10,230
228675-99DrillExxon Corp.Jan 23, 1984Feb 7, 1984—10,230

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 2, 1984Keystone Mills Co. G-3-111707Conroe (Middle Wilcox Cons.)Highmark Energy Operating LLCTemp Abandoned · shut in Nov 1, 20249,730

Formation tops

As filed on W-2/G-1. Subsea from 181 ft elevation.Download CSV →

FormationMD ftSubsea
1ST Upper Cockfield4,822-4,641
2ND Upper Cockfield4,866-4,685
1ST Main5,012-4,831
WilcoxWILCOX 18,092-7,911
WilcoxWILCOX 96009,592-9,411

Perforations

Perforated and open-hole intervals.

FromToType
9,5969,640Perforated
9,6409,662Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
2080——
13.3751,60517.51,320 sx
9.6256,30012.25885 S
5.59,7278.5600 sx

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 9, 1984Jul 23, 1984—
00Aug 8, 1984Jul 23, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/33930635, documented in the API reference.