WELL · 42-339-30676 · DISTRICT 3
Conroe Field Unit #1946
Montgomery County · Conroe field · Vertical
Conroe Field Unit #1946 (API 42-339-30676) is a well in Montgomery County operated by Highmark Energy Operating LLC, completed June 8, 1990.
The RRC has issued one drilling permit, issued September 7, 1984, permitted to 5,650 ft.
It was permitted by Exxon Corp. and has since transferred to Highmark Energy Operating LLC on the wellbore schedule.
Completion filings report 7 formation tops, including 1st Upper Cockfield, 2nd Upper Cockfield, 1st Main, 2nd Main.
Its 2 leases have reported 26.7M barrels of oil and 61.8M mcf of gas since January 1993, last reporting in July 2026. The leases carry 665 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Exxon Corp.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active (A)
- P-5 last filed
- Mar 9, 2026
- Permits on file
- 23
- Phone
- (469) 214-5299
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Highmark Energy Operating LLC |
| Production reports | Highmark Energy Operating, LLCthrough Apr 2026 |
| Latest permit | Exxon Corp.Sep 7, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,650
- total depth, ft
- 1
- permits on file
- Sep 7, 1984
- last permit issued
- Jun 8, 1990
- completed
- 26.7M
- cumulative oil, bbl
- 61.8M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 8, 1990
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 665 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Conroe Field Unit O-3-11659 | Conroe | Highmark Energy Operating, LLC | 664 | 26.7M | 61.4M | Jan 1993 – Jul 2026 |
| Conroe Field Unit G-3-169779 | Conroe | Wapiti Operating, LLC | 1 | 0 | 419K | Jul 1998 – Aug 2008 |
Oil, barrels lease total
Last 12 months 528,577 · prior 12 506,957(+4%)
Gas, mcf lease total
Last 12 months 174,487 · prior 12 323,330(-46%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Exxon Corp.Jan 1993 → Mar 2000
- 2Exxon Mobil CorporationApr 2000 → Aug 2006
- 3Wapiti Operating, LLCSep 2006 → Dec 2009
- 4Denbury Onshore, LLCJan 2010 → Oct 2024
- 5Highmark Energy Operating, LLCNov 2024 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 250640-99 | Drill | Exxon Corp. | Aug 29, 1984 | Sep 7, 1984 | Sep 30, 1984 | 5,650 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-169779 | — | — | — | — |
| — | — O-3-11659 | — | — | — | — |
| — | — O-3-11659 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 164 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| 1ST Upper Cockfield | 4,726 | -4,562 |
| 2ND Upper Cockfield | 4,768 | -4,604 |
| 1ST Main | 4,898 | -4,734 |
| 2ND Main | 4,957 | -4,793 |
| 2ND Main (B1,2) | 4,978 | -4,814 |
| I)d Main (B4) | 5,024 | -4,860 |
| 3RD Main | 5,066 | -4,902 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,726 | 4,738 | Perforated |
| 4,770 | 4,778 | Perforated |
| 4,911 | 4,915 | Perforated |
| 4,922 | 4,926 | Perforated |
| 4,957 | 4,968 | Perforated |
| 4,957 | 4,970 | Perforated |
| 4,957 | 4,972 | Perforated |
| 4,978 | 4,986 | Perforated |
| 4,988 | 4,994 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 1,630 | — | 125 S |
| 10.75 | 1,630 | 14.75 | 1,035 S |
| 10.75 | 1,632 | 14.75 | 1,035 S |
| 7 | 2,948 | — | 342 S |
| 7 | 5,150 | 9.875 | 341 S |
| 7 | 5,150 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 7, 2011 | Nov 3, 2010 | — |
| 00 | Dec 22, 2010 | Nov 3, 2010 | — |
| 00 | Dec 17, 2010 | Nov 3, 2010 | — |
| 00 | Nov 19, 2008 | Sep 5, 2008 | — |
| 00 | Sep 24, 1998 | Sep 9, 1998 | — |
| 00 | Sep 14, 1998 | — | — |
| 00 | Dec 5, 1996 | Oct 17, 1996 | — |
| 00 | Nov 13, 1996 | May 8, 1996 | — |
| 00 | Oct 15, 1996 | Jun 28, 1990 | — |
| 00 | Jul 17, 1990 | Jun 28, 1990 | — |
| 00 | Apr 17, 1990 | Mar 1, 1990 | — |
| 00 | Apr 6, 1988 | Mar 21, 1988 | — |
| 00 | Dec 8, 1986 | Nov 17, 1986 | — |
| 00 | Jan 28, 1985 | Jan 14, 1985 | — |
| 00 | Nov 13, 1984 | Nov 1, 1984 | — |
| 00 | Nov 9, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-339-30676 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-339-30676 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 1.37M
- bbl, last 12 reported months
- 1.37M
- bbl, all reported
- Mar 1996
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000071674 | H-1 Injection | Canceled Dec 5, 1996 | 0 | 2,000 | 4,850–5,100 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 1,373,727 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/33930676, documented in the API reference.