TEXAS · WELLS · MONTGOMERY COUNTY · MOORE, H. N. LEASE · API 42-339-30691 · DISTRICT 03

Moore H. N. #1960

Shut in

Montgomery County · Conroe (Middle Wilcox Cons.) field · Temp Abandoned  · Vertical

Moore H. N. #1960 (API 42-339-30691) is a well in Montgomery County operated by Highmark Energy Operating LLC, completed July 11, 1985 and listed as temp abandoned on the RRC schedule, shut in January 1, 1998.

The RRC has issued 2 drilling permits between 1984 and 1992, permitted to 9,696 ft.

It was permitted by Exxon Corp. and has since transferred to Highmark Energy Operating LLC on the wellbore schedule.

Completion filings report one formation top, including Wilcox.

Its lease has reported 57 mcf of gas since January 1993, with no volume in the three years through April 2026.

Operator of record

Highmark Energy Operating LLC

Permitted by Exxon Corp.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Mar 9, 2026
Permits on file
23
Phone
(469) 214-5299

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHighmark Energy Operating LLC
Production reportsHighmark Energy Operating, LLCthrough May 1994
Latest permitExxon Corp.Aug 4, 1992

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,696
total depth, ft
2
permits on file
Aug 4, 1992
last permit issued
Jul 11, 1985
completed
0
cumulative oil, bbl
57
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 1994 THROUGH May 1994

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 11, 1985
Shut in
Jan 1, 1998
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Moore, H. N. G-3-118245Conroe (Middle Wilcox Cons.)Highmark Energy Operating, LLC1057Jan 1993 – May 1994

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.May 1994 → May 1994

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
401023-99RecompletionExxon Corp.Jul 9, 1992Aug 4, 1992—5,900
260488-99DrillExxon Corp.Nov 27, 1984Dec 11, 1984Dec 30, 198410,200

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 11, 1985Moore H. N. G-3-118245Conroe (Middle Wilcox Cons.)Highmark Energy Operating LLCTemp Abandoned · shut in Jan 1, 19989,696

Formation tops

As filed on W-2/G-1. Subsea from 182 ft elevation.Download CSV →

FormationMD ftSubsea
Wilcox7,691-7,509
WilcoxWILCOX 86008,398-8,216
WilcoxWILCOX 92508,970-8,788
WilcoxWILCOX 96009,562-9,380

Perforations

Perforated and open-hole intervals.

FromToType
9,4399,460Perforated
9,4689,472Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
24100——
13.3751,57617.51,300 S
9.6256,38112.251,760 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Oct 16, 1985Aug 28, 1985—
00Oct 8, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/33930691, documented in the API reference.