WELL · 42-339-30964 · DISTRICT 3
Keystone Mills Co. #45
Montgomery County · Conroe (Middle Wilcox Cons.) field · Temp Abandoned · Vertical
Keystone Mills CO. #45 (API 42-339-30964) is a permitted well in Montgomery County filed by Exxon Mobil Corporation; no completion report is on file yet.
The RRC has issued 3 drilling permits (amended twice) between 1999 and 2003, permitted to 13,194 ft.
It was permitted by Exxon Mobil Corporation and has since transferred to Highmark Energy Operating LLC on the wellbore schedule.
Completion filings report 7 formation tops, including Vicksburg, Jackson, Upper Cockfield, Cook Mountain.
Its 4 leases have reported 592 barrels of oil and 562K mcf of gas since June 1999, last reporting in July 2026. The leases carry 4 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Exxon Mobil Corporation; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active (A)
- P-5 last filed
- Mar 9, 2026
- Permits on file
- 23
- Phone
- (469) 214-5299
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Exxon Mobil Corporation |
| Production reports | Denbury Onshore, LLCthrough Oct 2024 |
| Latest permit | Exxon Mobil CorporationJan 30, 2003 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 13,194
- total depth, ft
- 5
- permits on file
- Jan 30, 2003
- last permit issued
- —
- completed
- 592
- cumulative oil, bbl
- 562K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 1999 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- —
- Shut in
- Nov 1, 2024
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Keystone Mills Co. G-3-203245 | Conroe (Middle Wilcox Cons.) | Highmark Energy Operating, LLC | 1 | 0 | 110K | Aug 2004 – Jul 2026 |
| Keystone Mills Co. O-3-24431 | Conroe (Middle Wilcox Cons.) | Exxon Mobil Corporation | 1 | 592 | 22.2K | Aug 2003 – Sep 2004 |
| Keystone Mills Co. G-3-176201 | Conroe, S. (Wilcox 10,000) | Exxon Mobil Corporation | 1 | 0 | 353K | Nov 1999 – Dec 2003 |
| Keystone Mills Co. G-3-174460 | Conroe, S. (Wilcox 25-10,300) | Exxon Corp. | 1 | 0 | 76.8K | Jun 1999 – Nov 1999 |
Gas, mcf lease total
Last 12 months 0 · prior 12 688(-100%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Exxon Corp.Jun 1999 → Mar 2000
- 2Exxon Mobil CorporationApr 2000 → Jun 2006
- 3Wapiti Operating, LLCMar 2007 → Oct 2009
- 4Denbury Onshore, LLCOct 2014 → Oct 2024
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 527856-99 | Recompletion | Exxon Mobil Corporation | Jan 29, 2003 | Jan 30, 2003 | Apr 21, 2003 | 12,500 |
| 486015-97 | Recompletion | Exxon Corp. | Nov 16, 1999 | Jul 20, 1999 | Aug 25, 1999 | 13,094 |
| 486015-98 | Recompletion | Exxon Corp. | Sep 7, 1999 | Jul 20, 1999 | — | 13,094 |
| 486015-99 | Recompletion | Exxon Corp. | Jul 20, 1999 | Jul 20, 1999 | — | 13,094 |
| 482008-99 | Drill | Exxon Corp. | Jan 12, 1999 | Jan 13, 1999 | Mar 4, 1999 | 13,400 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | Keystone Mills Co. G-3-203245 | Conroe (Middle Wilcox Cons.) | Highmark Energy Operating LLC | Temp Abandoned · shut in Nov 1, 2024 | 13,194 |
| Aug 27, 2003 | Keystone Mills Co. O-3-24431 | Conroe (Middle Wilcox Cons.) | Exxon Mobil Corporation | Not on Schedule | — |
| Aug 27, 2003 | Keystone Mills Co. O-3-24431 | Conroe (Middle Wilcox Cons.) | Exxon Mobil Corporation | Not on Schedule | — |
| Nov 19, 1999 | Keystone Mills Co. G-3-176201 | Conroe (Middle Wilcox Cons.) | Exxon Mobil Corporation | Not on Schedule | — |
| Jun 9, 1999 | Keystone Mills Co. G-3-174460 | Conroe S. (Wilcox 25-10 300) | Exxon Mobil Corporation | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 180 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,021 | 10,028 | Perforated |
| 10,031 | 10,038 | Perforated |
| 10,503 | 10,509 | Perforated |
| 10,848 | 10,872 | Perforated |
| 12,348 | 12,358 | Perforated |
| 12,442 | 12,454 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 1,596 | 17.5 | 1,365 S |
| 5.5 | 8,812 | — | 530 S |
| 9.625 | 9,397 | 12.25 | 2,820 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 3, 2004 | Aug 25, 2004 | — |
| 00 | Sep 10, 2004 | — | — |
| 00 | Jan 12, 2004 | Oct 7, 2003 | Yes |
| 00 | Oct 29, 2003 | — | — |
| 00 | Apr 28, 2000 | Dec 14, 1999 | — |
| 00 | Mar 28, 2000 | — | — |
| 00 | Oct 21, 1999 | Jul 19, 1999 | Yes |
| 00 | Oct 14, 1999 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-339-30964 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-339-30964 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/33930964, documented in the API reference.