WELL · 42-339-30981 · DISTRICT 3

Mec/Sealy-Smith B #1

Plugged

Montgomery County · Lake Creek N. (Yegua 6300) field  · Vertical

Mec/Sealy-Smith B #1 (API 42-339-30981) is a plugged well in Montgomery County, plugged June 17, 2022, last operated by Devon Energy Production CO L.P..

The RRC has issued 3 drilling permits between 2000 and 2012, permitted to 6,800 ft.

Completion filings report 5 formation tops, including Hockley, Siphonina Jackson, Siponina Jackson, Yegua.

Operator of record

Devon Energy Production Co L.P.

Based in
Oklahoma City, OK
P-5 status
Active (A)
P-5 last filed
Dec 18, 2025
Permits on file
9,266
Phone
(405) 235-3611

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleDevon Energy Production Co L.P.
Production reportsDaylight Petroleum LLCthrough Mar 2021
Latest permitDevon Energy Production Co, L.P.Jan 12, 2012

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,800
total depth, ft
3
permits on file
Jan 12, 2012
last permit issued
Aug 30, 2001
completed
0
cumulative oil, bbl
2.33M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 2000 THROUGH Mar 2024

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 30, 2001
Shut in
—
Plugged
Jun 17, 2022

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Mec/Sealy-Smith 'B' G-3-271102Lake Creek, N. (Yegua 5600)Daylight Petroleum LLC10435KJan 2013 – Mar 2024
Mec/Sealy-Smith "B" G-3-178687Lake Creek, N. (Yegua 6080)Devon Energy Production Co, L.P.10405KJul 2000 – Jan 2013
Mec/Sealy-Smith "B" G-3-185402Lake Creek, N. (Yegua 6300)Devon Energy Production Co, L.P.101.49MAug 2001 – Jan 2013

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mitchell Energy CorporationJul 2000 → Dec 2000
  2. 2Mitchell Energy Company L.P.Jan 2001 → Mar 2002
  3. 3Devon Energy Operating Co., L.P.Apr 2002 → Jul 2004
  4. 4Devon Energy Production Co, L.P.Aug 2004 → Feb 2013
  5. 5Linn Operating, Inc.Aug 2014 → Jan 2017
  6. 6Linn Operating, LLCAug 2017 → Aug 2017
  7. 7Sydri Operating, LLCMay 2018 → Jan 2021
  8. 8Daylight Petroleum LLCFeb 2021 → Mar 2021

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
731163-99RecompletionDevon Energy Production Co, L.P.Jan 6, 2012Jan 12, 2012Jan 16, 20126,550
511830-99RecompletionMitchell Energy Company L.P.Jul 25, 2001Jul 26, 2001Aug 21, 20016,410
493906-99DrillMitchell Energy CorporationApr 10, 2000Apr 13, 2000Jun 4, 20006,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-178687————
—— G-3-185402————
—— G-3-271102————

Formation tops

As filed on W-2/G-1. Subsea from 197 ft elevation.Download CSV →

FormationMD ftSubsea
Hockley4,035-3,838
Siphonina Jackson4,185-3,988
Siponina Jackson4,185-3,988
Yegua4,905-4,708
Cook Mountain6,405-6,208
Cook Mountain6,450-6,253

Perforations

Perforated and open-hole intervals.

FromToType
6,0226,028Perforated
6,0826,086Perforated
6,3076,354Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,82112.25875 S
4.56,5507.875550 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 17, 2014May 29, 2013—
00Nov 20, 2001Sep 27, 2001Yes
00Nov 12, 2001——
00Oct 31, 2000Jul 28, 2000Yes
00Oct 3, 2000——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/33930981, documented in the API reference.