WELL · 42-341-00671 · DISTRICT 10
Shelton A #2 X
Moore County · Horizontal
Shelton A #2 X (API 42-341-00671) is a permitted horizontal well in Moore County filed by Linn Operating, Inc.; no completion report is on file yet.
The RRC has issued 3 drilling permits (amended once) between 1997 and 2009, permitted to 3,400 ft.
Completion filings report 3 formation tops, including Red Cave, Panhandle Lime, Brown Dolomite.
Operator of record
Houston, TX · P-5 Y, filed Mar 8, 2019 · 1,401 permits on file · (281) 840-4000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Scout Energy Management LLCthrough Apr 2026 |
| Latest permit | Linn Operating, Inc.Feb 19, 2009 |
- 3,400
- total depth, ft
- 4
- permits on file
- Feb 19, 2009
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 4.03M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Shelton G-14-25402 | Panhandle, West | Burk Royalty Co., Ltd. | 1 | 0 | 4.03M | Jan 1993 – Jul 2026 |
Gas, mcf lease total
Last 12 months 28,376 · prior 12 32,924(-14%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Seagull Midcon Inc.Jan 1993 → May 1998
- 2Seagull Energy E&P Inc.Jun 1998 → Mar 1999
- 3Huber, J. M., CorporationApr 1999 → Oct 2005
- 4Stallion Energy LLCNov 2005 → Jun 2007
- 5Linn Operating, Inc.Jul 2007 → Apr 2017
- 6Linn Operating, LLCMay 2017 → Feb 2018
- 7Scout Energy Management LLCMar 2018 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 678596-98 | Recompletion | Linn Operating, Inc. | Sep 9, 2009 | Feb 19, 2009 | Apr 29, 2009 | 3,400 |
| 678596-99 | Recompletion | Linn Operating, Inc. | Feb 14, 2009 | Feb 19, 2009 | — | 3,400 |
| 557611-99 | Drill | Huber, J. M., Corporation | Feb 11, 2005 | Feb 15, 2005 | — | 3,000 |
| 469842-99 | Recompletion | Seagull Midcon Inc. | Nov 7, 1997 | Nov 7, 1997 | Oct 27, 1997 | 3,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-25402 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,173 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Red Cave | 1,520 | 1,653 |
| Panhandle Lime | 1,778 | 1,395 |
| Brown Dolomite | 2,162 | 1,011 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,150 | 2,875 | Open hole |
| 2,213 | 4,510 | Perforated |
| 2,276 | 4,932 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 2,150 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 3, 2010 | Jul 29, 2008 | Yes |
| 00 | Jun 1, 1998 | Jan 16, 1998 | Yes |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-341-00671 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-341-00671 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/34100671, documented in the API reference.