TEXAS · WELLS · MOORE COUNTY · API 42-341-01216 · DISTRICT 08
Coon R. S. #M 24R
Moore County · Panhandle West (Red Cave North) field · Vertical
Coon R. S. #M 24R (API 42-341-01216) is a plugged well in Moore County, plugged March 26, 2004, last operated by Chesapeake Operating Inc..
The RRC has issued one drilling permit, issued May 21, 2001, permitted to 3,231 ft.
Completion filings report 3 formation tops, including Red Cave, Panhandle Lime, Brown Dolomite.
Operator of record
- Based in
- Oklahoma City, OK
- P-5 status
- Delinquent (D)
- P-5 last filed
- Dec 10, 2024
- Permits on file
- 13,061
- Phone
- (405) 935-3100
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Chesapeake Operating Inc. |
| Production reports | Chesapeake Operating, Inc.through Sep 2001 |
| Latest permit | Chesapeake Operating, Inc.May 21, 2001 |
- 3,231
- total depth, ft
- 1
- permits on file
- May 21, 2001
- last permit issued
- Jun 17, 2001
- completed
- 0
- cumulative oil, bbl
- 384K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2004
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 17, 2001
- Shut in
- —
- Plugged
- Mar 26, 2004
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Coon, R. S. G-14-184733 | Panhandle, West (Red Cave North) | Chesapeake Operating, Inc. | 1 | 0 | 1.64K | Jun 2001 – Mar 2004 |
| Coon, R. S. G-14-35046 | Panhandle, West | Chesapeake Operating, Inc. | 1 | 0 | 382K | Jan 1993 – Jun 2001 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Natural Gas Pipeline Co of Amer.Jan 1993 → Jan 1997
- 2Mc Panhandle, Inc.Feb 1997 → Jul 1998
- 3Chesapeake Operating, Inc.Aug 1998 → Sep 2001
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 509255-99 | Recompletion | Chesapeake Operating, Inc. | May 21, 2001 | May 21, 2001 | Jun 2, 2001 | 3,231 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jun 17, 2001 | Coon R. S. G-14-184733 | Panhandle West (Red Cave North) | Chesapeake Operating Inc. | Plugged | — |
| Jun 24, 1964 | Coon R. S. G-14-35046 | Panhandle West | Chesapeake Operating Inc. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,507 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Red Cave | 1,946 | 1,561 |
| Panhandle Lime | 2,451 | 1,056 |
| Brown Dolomite | 2,800 | 707 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,982 | 2,132 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 7 | 1,602 | 9.625 | 550 S |
| 4.5 | 3,267 | 6.25 | 135 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 14, 2002 | Aug 23, 2001 | — |
| 00 | Oct 4, 2001 | — | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-341-01216 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-341-01216 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/34101216, documented in the API reference.