WELL · 42-341-31006 · DISTRICT 10
Coon Ranch #2
Moore County · Panhandle Moore County Field field · Vertical
Coon Ranch #2 (API 42-341-31006) is a plugged well in Moore County, plugged April 6, 2004, last operated by Comstock Oil & Gas Inc..
The RRC has issued one drilling permit, issued July 11, 1983, permitted to 3,800 ft.
It was permitted by Mobil Producing TX. & N.M. Inc. and has since transferred to Comstock Oil & Gas Inc. on the wellbore schedule.
Completion filings report 4 formation tops, including Red Cave, Panhandle Lime, Moore County Lime, Granite Wash.
Operator of record
Permitted by Mobil Producing TX. & N.M. Inc.; the EWA schedule now lists a different operator.
- Based in
- Frisco, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Jan 12, 2004
- Permits on file
- 319
- Phone
- (800) 877-1322
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Comstock Oil & Gas Inc. |
| Production reports | none |
| Latest permit | Mobil Producing TX. & N.M. Inc.Jul 11, 1983 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,800
- total depth, ft
- 1
- permits on file
- Jul 11, 1983
- last permit issued
- Apr 10, 1984
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2004
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 10, 1984
- Shut in
- —
- Plugged
- Apr 6, 2004
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Coon Ranch O-14-5881 | Panhandle Moore County Field | Comstock Oil & Gas, Inc. | 1 | 0 | 0 | Jan 1993 – Aug 2004 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 200950-99 | Drill | Mobil Producing TX. & N.M. Inc. | Jul 11, 1983 | Jul 11, 1983 | Jul 22, 1983 | 3,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-14-5881 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,441 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Red Cave | 1,862 | 1,579 |
| Panhandle Lime | 2,326 | 1,115 |
| Moore County Lime | 2,826 | 615 |
| Granite Wash | 3,480 | -39 |
| Granite WashGRANITE WASH. | 3,480 | -39 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,487 | 3,715 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 515 | 14.75 | 500 sx |
| 7.625 | 2,800 | 9.875 | 625 sx |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 21, 1984 | Jun 4, 1984 | — |
| 00 | Sep 20, 1984 | Jun 4, 1984 | — |
| 00 | Jun 22, 1984 | Jun 4, 1984 | — |
| 00 | Jun 21, 1984 | Jun 4, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-341-31006 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-341-31006 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/34131006, documented in the API reference.