WELL · 42-341-32624 · DISTRICT 10
Makeig Ella #209
Moore County · Texas Hugoton field · Producing · Vertical
Makeig Ella #209 (API 42-341-32624) is a well in Moore County operated by Pantera Energy Company, completed March 27, 1999 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued January 22, 1999, permitted to 3,400 ft.
It was permitted by Crescendo Resources, L.P. and has since transferred to Pantera Energy Company on the wellbore schedule.
Completion filings report 4 formation tops, including Tubb, Red Cave, Pan Lm, B. Dol.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Crescendo Resources, L.P.; the EWA schedule now lists a different operator.
- Based in
- Amarillo, TX
- P-5 status
- Active (A)
- P-5 last filed
- Oct 1, 2025
- Permits on file
- 359
- Phone
- (806) 376-6625
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Pantera Energy Company |
| Production reports | Pantera Energy Companythrough Apr 2026 |
| Latest permit | Crescendo Resources, L.P.Jan 22, 1999 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,400
- total depth, ft
- 1
- permits on file
- Jan 22, 1999
- last permit issued
- Mar 27, 1999
- completed
- 0
- cumulative oil, bbl
- 827K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 1999 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Mar 27, 1999
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Makeig, Ella G-14-173063 | Texas Hugoton | Pantera Energy Company | 1 | 0 | 827K | Mar 1999 – Jul 2026 |
Gas, mcf lease total
Last 12 months 17,273 · prior 12 18,514(-7%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Crescendo Resources, L.P.Apr 1999 → Mar 2000
- 2Amoco Production CompanyApr 2000 → Dec 2001
- 3BP America Production CompanyJan 2002 → Sep 2014
- 4Pantera Energy CompanyOct 2014 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 482095-99 | Drill | Crescendo Resources, L.P. | Jan 19, 1999 | Jan 22, 1999 | Feb 23, 1999 | 3,400 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-173063 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,582 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,146 | 3,450 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 559 | 12.25 | 300 S |
| 5.5 | 3,079 | 7.875 | 265 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 21, 1999 | Jun 7, 1999 | Yes |
| 00 | Jun 14, 1999 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-341-32624 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-341-32624 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/34132624, documented in the API reference.