TEXAS · WELLS · MOORE COUNTY · REID LEASE · API 42-341-32934 · DISTRICT 08
Reid #1
Moore County · Panhandle West field · Producing · Vertical
Reid #1 (API 42-341-32934) is a well in Moore County operated by J. W. Resources Inc., completed October 14, 2005 and listed as producing on the RRC schedule, shut in June 1, 2026.
The RRC has issued one drilling permit, issued July 6, 2005, permitted to 3,550 ft.
Completion filings report one formation top, including Brown Dolomite.
Its lease has reported 131K mcf of gas since October 2005, last reporting volume in April 2026.
Operator of record
- Based in
- Amarillo, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jan 9, 2025
- Permits on file
- 124
- Phone
- (806) 467-9600
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | J. W. Resources Inc. |
| Production reports | J. W. Resources Inc.through Apr 2026 |
| Latest permit | J. W. Resources Inc.Jul 6, 2005 |
- 3,550
- total depth, ft
- 1
- permits on file
- Jul 6, 2005
- last permit issued
- Oct 14, 2005
- completed
- 0
- cumulative oil, bbl
- 131K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Nov 2005 THROUGH Apr 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Oct 14, 2005
- Shut in
- Jun 1, 2026
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Reid G-14-212853 | Panhandle, West | J. W. Resources Inc. | 1 | 0 | 131K | Oct 2005 – Apr 2026 |
Gas, mcf lease total
Last 12 months 1,139 · prior 12 2,740(-58%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1J. W. Resources Inc.Nov 2005 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 603009-99 | Drill | J. W. Resources Inc. | Jul 5, 2005 | Jul 6, 2005 | Aug 8, 2005 | 3,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Oct 14, 2005 | Reid G-14-212853 | Panhandle West | J. W. Resources Inc. | Producing · shut in Jun 1, 2026 | 3,550 |
Formation tops
As filed on W-2/G-1. Subsea from 3,729 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Brown Dolomite | 3,252 | 477 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,190 | 3,550 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 615 | 13.5 | 375 S |
| 7 | 3,190 | 8.75 | 150 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 1, 2006 | Nov 21, 2005 | Yes |
| 00 | Dec 27, 2005 | — | — |
Well logs
The RRC's map lists this well among those with logs online. Its monthly inventories loaded here, which start in July 2006, list none for it, so none are itemized.
Open the RRC's log search for this well ↗The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-341-32934 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-341-32934 → scanned completion filings
The logs loaded for this well are under Well logs, with the RRC's log search for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/34132934, documented in the API reference.