TEXAS · WELLS · MOORE COUNTY · API 42-341-81475 · DISTRICT 08
McDowell Emma #1
Moore County · Panhandle Moore County Field field · Vertical
Mcdowell Emma #1 (API 42-341-81475) is a plugged well in Moore County, plugged April 10, 1985, last operated by Devon Energy Production CO L.P..
The RRC has issued one drilling permit, issued December 29, 1982, permitted to 3,370 ft.
It was permitted by Kerr-Mcgee Corporation and has since transferred to Devon Energy Production CO L.P. on the wellbore schedule.
Completion filings report 6 formation tops, including Gloriettasd, Cimarron Anhydrite, Tubb, Red Cave.
Operator of record
Devon Energy Production Co L.P.
Permitted by Kerr-McGee Corporation; the EWA schedule now lists a different operator.
- Based in
- Oklahoma City, OK
- P-5 status
- Active (A)
- P-5 last filed
- Dec 18, 2025
- Permits on file
- 9,266
- Phone
- (405) 235-3611
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Devon Energy Production Co L.P. |
| Production reports | none |
| Latest permit | Kerr-McGee CorporationDec 29, 1982 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,370
- total depth, ft
- 1
- permits on file
- Dec 29, 1982
- last permit issued
- Apr 17, 1982
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 17, 1982
- Shut in
- —
- Plugged
- Apr 10, 1985
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 181596-99 | Recompletion | Kerr-McGee Corporation | Dec 29, 1982 | Dec 29, 1982 | — | 3,370 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Apr 17, 1982 | McDowell Emma O-14-1944 | Panhandle Moore County Field | Devon Energy Production Co L.P. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,338 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Gloriettasd | 1,055 | 2,283 |
| Cimarron Anhydrite | 1,390 | 1,948 |
| TubbTUBB SAND | 1,650 | 1,688 |
| Red Cave | 1,830 | 1,508 |
| Panhandle Lime | 2,365 | 973 |
| Brown Dolomite | 2,795 | 543 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,164 | 3,174 | Perforated |
| 3,204 | 3,277 | Perforated |
| 3,288 | 3,308 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 506 | 12.25 | 450 S |
| 4.5 | 3,390 | 7.875 | 400 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 25, 1986 | Aug 16, 1985 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-341-81475 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-341-81475 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- —
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000047493 | H-1 Injection | Plugged Sep 19, 1985 | 0 | 0 | 0–0 |
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/34181475, documented in the API reference.