WELL · 42-345-30358 · DISTRICT 8

Shoenail #1

Y

Motley County · The 8TH Dimension (Canyon Reef) field · Shut IN  · Vertical

Shoenail #1 (API 42-345-30358) is a well in Motley County operated by Patton E. N. Oil Company Inc., completed August 24, 2022 and listed as shut in on the RRC schedule.

The RRC has issued one drilling permit, issued May 16, 2022, permitted to 6,000 ft.

Completion filings report 6 formation tops, including Coleman Junction, Wolfcamp, Cisco, Canyon.

No lease production has been reported under this well’s leases.

Operator of record

Patton E. N. Oil Company Inc.

Abilene, TX · P-5 Y, filed Jun 4, 2026 · 153 permits on file · (325) 669-8515

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePatton E. N. Oil Company Inc.
Production reportsnone
Latest permitPatton, E. N. Oil Company, Inc.May 16, 2022
6,000
total depth, ft
1
permits on file
May 16, 2022
last permit issued
Aug 24, 2022
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2022 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 24, 2022
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

34.247037, -100.708086

OpenStreetMap → ·  Google Maps →

Permit surface location from the RRC GIS record, in Motley County.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Shoenail O-11-71335The 8TH Dimension (Canyon Reef)Patton, E. N. Oil Company, Inc.100Aug 2022 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
880027-99DrillPatton, E. N. Oil Company, Inc.May 11, 2022May 16, 2022Jul 31, 20226,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-71335————

Formation tops

As filed on W-2/G-1. Subsea from 2,076 ft elevation.Download CSV →

FormationMD ftSubsea
Coleman JunctionCOLEMAN JUNCTION - POSSIBLE LOST3,630-1,554
Wolfcamp4,075-1,999
Cisco5,192-3,116
Canyon5,680-3,604
Injection Interval - Possible OV——
Pennsylvanian——

Perforations

Perforated and open-hole intervals.

FromToType
4,2104,224Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37564717.5715 S
9.6254,56812.25295 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 11, 2024Nov 21, 2023Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Nearby wells and their tops

NEAREST 3 LOCATED WELLS WITH TOPS · WITHIN 16 KM

Draw a cross-section

This well's tops beside its 3 nearest neighbours, subsea-aligned so they line up regardless of surface terrain.

Open the cross-section →

Cogdell42-345-30344

13.2 KM · Patton, E. N. Oil Company, Inc. · Section with this well →

Coleman Junction3,120-1,160
Cisco4,299-2,339
Pennsylvanian4,299-2,339
Canyon4,981-3,021
Injection Interval - Possible OV—

Taylor42-345-30342

14.6 KM · Patton, E. N. Oil Company, Inc. · Section with this well →

Coleman Junction3,260-1,307
Pennsylvanian4,295-2,342
Cisco4,295-2,342
Canyon4,984-3,031
Injection Interval - Possible OV—

Taylor 'B'42-345-30360

15.1 KM · Patton, E. N. Oil Company, Inc. · Section with this well →

Coleman Junction3,120-1,172
Wolfcamp3,777-1,829
Canyon4,946-2,998
Cisco—
Injection Interval - Possible OV—
Pennsylvanian—

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/34530358, documented in the API reference.