TEXAS · WELLS · NACOGDOCHES COUNTY · API 42-347-30903 · DISTRICT 06

Chandler #1

Plugged

Nacogdoches County · Toolan (James Lime) field  · Vertical

Chandler #1 (API 42-347-30903) is a plugged well in Nacogdoches County, plugged June 26, 2009, last operated by Valence Operating Company.

The RRC has issued 4 drilling permits between 1982 and 1998, permitted to 9,285 ft.

Completion filings report 6 formation tops, including Mass Anhyd., Mass Anyd., Rodessa, James Lime.

Operator of record

Valence Operating Company

Based in
Kingwood, TX
P-5 status
Active (A)
P-5 last filed
Jun 4, 2026
Permits on file
990
Phone
(281) 359-3659

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsValence Operating Companythrough Jun 2009
Latest permitValence Operating CompanyFeb 18, 1998
9,285
total depth, ft
4
permits on file
Feb 18, 1998
last permit issued
Nov 6, 1997
completed
0
cumulative oil, bbl
8.46K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 2009

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 6, 1997
Shut in
—
Plugged
Jun 26, 2009

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Chandler G-6-167340Toolan (James Lime)Valence Operating Company108.44KNov 1997 – Jun 2009
Chandler G-6-122394Toolan (Travis Peak)Valence Operating Company1023Jan 1993 – Nov 1997

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Valence Operating CompanySep 1995 → Jun 2009

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
473047-99RecompletionValence Operating CompanyFeb 6, 1998Feb 18, 1998Oct 27, 19977,865
301283-99RecompletionTXO Production Corp.Feb 13, 1986Apr 11, 1986—9,285
280772-99RecompletionTXO Production Corp.Jul 15, 1985Jul 23, 1985—7,865
182430-99DrillTXO Production Corp.Dec 31, 1982Dec 31, 1982Jan 14, 19838,350

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 6, 1997Chandler G-6-167340Toolan (James Lime)Valence Operating CompanyPlugged—
May 5, 1986Chandler G-6-122394Toolan (Travis Peak)Valence Operating CompanyPlugged—
May 5, 1986Chandler O-6-11980Toolan (Travis Peak)TXO Production Corp.Plugged—
Feb 9, 1983Chandler O-6-10959Toolan (Pettit Lower)Valence Operating CompanyPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 414 ft elevation.Download CSV →

FormationMD ftSubsea
Mass Anhyd.6,035-5,621
Mass Anyd.6,035-5,621
Rodessa6,260-5,846
James LimeJAMES6,740-6,326
Pettit7,010-6,596
Travis Peak7,595-7,181

Perforations

Perforated and open-hole intervals.

FromToType
6,7826,877Perforated
7,1547,400Perforated
7,7407,746Perforated
7,7547,757Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,60511700 S
2.3757,053——
4.57,8657.8751,000 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 17, 1998Feb 5, 1998Yes
00Apr 7, 1998——
00Nov 20, 1986Oct 22, 1986—
00Nov 1, 1986——
00Jul 11, 1986May 30, 1986Yes
00Jul 2, 1986——
00Jan 12, 1984Feb 10, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/34730903, documented in the API reference.