TEXAS · WELLS · NACOGDOCHES COUNTY · STONE FORT NATIONAL BANK LEASE · API 42-347-31364 · DISTRICT 06

Stone Fort National Bank #1

Plugged

Nacogdoches County · Naconiche Creek (Rod.-TP Cons.) field  · Vertical

Stone Fort National Bank #1 (API 42-347-31364) is a plugged well in Nacogdoches County, plugged August 15, 2018, last operated by Weatherly Oil & Gas LLC.

The RRC has issued one drilling permit, issued December 7, 1984, permitted to 7,855 ft.

It was permitted by Prairie Producing Company and has since transferred to Weatherly Oil & Gas LLC on the wellbore schedule.

Completion filings report 6 formation tops, including Austin Chalk, Paluxy, Glen Rose, Massive Anhydrite (marker).

Operator of record

Weatherly Oil & Gas LLC

Permitted by Prairie Producing Company; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Delinquent (D)
P-5 last filed
Aug 10, 2018
Permits on file
5
Phone
(512) 892-8930

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWeatherly Oil & Gas LLC
Production reportsWeatherly Oil & Gas, LLCthrough May 2009
Latest permitPrairie Producing CompanyDec 7, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,855
total depth, ft
1
permits on file
Dec 7, 1984
last permit issued
Apr 15, 1985
completed
0
cumulative oil, bbl
110K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2009

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 15, 1985
Shut in
—
Plugged
Aug 15, 2018

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Stone Fort National Bank G-6-116536Naconiche Creek (Rod.-TP Cons.)Weatherly Oil & Gas, LLC10110KJan 1993 – Aug 2018

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Hurley Petroleum CorporationJan 1993 → May 1995
  2. 2Kaiser-Francis Oil CompanyJun 1995 → Dec 2005
  3. 3Chesapeake Operating, Inc.Jan 2006 → May 2009

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
260174-99DrillPrairie Producing CompanyMay 6, 1985Dec 7, 1984Dec 12, 19847,855

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 15, 1985Stone Fort National Bank G-6-116536Naconiche Creek (Rod.-TP Cons.)Weatherly Oil & Gas LLCPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 352 ft elevation.Download CSV →

FormationMD ftSubsea
Austin ChalkBASE AUSTIN CHALK3,935-3,583
Paluxy4,568-4,216
Glen RoseUPPER GLEN ROSE4,870-4,518
Massive Anhydrite (marker)BASE MASSIVE ANHYDRITE6,528-6,176
James LimeJAMES7,027-6,675
PettitPETTET7,301-6,949

Perforations

Perforated and open-hole intervals.

FromToType
7,5787,586Perforated
7,6027,612Perforated
7,6287,632Perforated
7,6367,640Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,96512.251,113 S
5.57,8578.75719 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 7, 1985May 16, 1985—
00Jun 6, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/34731364, documented in the API reference.