WELL · 42-347-31713 · DISTRICT 6

Hill Robert C. #1

Y

Nacogdoches County · Waterman (Travis Peak) field · Temp Abandoned  · Vertical

Hill Robert C. #1 (API 42-347-31713) is a well in Nacogdoches County operated by Sydri Operating LLC, completed March 13, 2003 and listed as temp abandoned on the RRC schedule.

The RRC has issued one drilling permit, issued May 24, 2001, permitted to 10,800 ft.

It was permitted by Camterra Resources, Inc. and has since transferred to Sydri Operating LLC on the wellbore schedule.

Completion filings report 6 formation tops, including B/Austin Chalk, T/Massive Anhydrite, B/Massive Anhydrite, T/James.

No lease production has been reported under this well’s leases.

Operator of record

Sydri Operating LLC

Permitted by Camterra Resources, Inc.; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Active (A)
P-5 last filed
Mar 11, 2026
Permits on file
46
Phone
(214) 373-8626

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSydri Operating LLC
Production reportsSydri Operating, LLCthrough Feb 2024
Latest permitCamterra Resources, Inc.May 24, 2001

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,800
total depth, ft
1
permits on file
May 24, 2001
last permit issued
Mar 13, 2003
completed
0
cumulative oil, bbl
454K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 2002 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 13, 2003
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hill, Robert C. G-6-187668Waterman (Travis Peak)Sydri Operating, LLC10454KFeb 2002 – Jul 2026

Gas, mcf lease total

Last 12 months 0 · prior 12 0

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Camterra Resources, Inc.Feb 2002 → Apr 2006
  2. 2Petrohawk Operating CompanyMay 2006 → Jul 2013
  3. 3BHP Billiton Pet(txla OP) CoAug 2013 → Jan 2015
  4. 4Tanos Exploration II, LLCFeb 2015 → Jun 2018
  5. 5Titan Rock E&P, LLCJul 2018 → Mar 2023
  6. 6Sydri Operating, LLCApr 2023 → Feb 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
509177-99DrillCamterra Resources, Inc.May 18, 2001May 24, 2001Jun 15, 200110,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-187668————

Formation tops

As filed on W-2/G-1. Subsea from 321 ft elevation.Download CSV →

FormationMD ftSubsea
B/Austin Chalk4,135-3,814
T/Massive Anhydrite6,371-6,050
B/Massive Anhydrite6,535-6,214
T/James7,072-6,751
T/Sligo7,336-7,015
T/Travis Peak7,949-7,628

Perforations

Perforated and open-hole intervals.

FromToType
8,1008,105Perforated
8,1548,164Perforated
8,3068,316Perforated
8,9558,960Perforated
9,0569,061Perforated
9,1569,161Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6253,01512.252,530 S
5.510,2997.8751,685 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 8, 2003Apr 16, 2003—
00May 13, 2002Mar 14, 2002Yes
00Mar 28, 2002——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/34731713, documented in the API reference.