TEXAS · WELLS · NACOGDOCHES COUNTY · NORTH HAYTER TRUST LEASE · API 42-347-31954 · DISTRICT 06

North Hayter Trust #15

Shut in

Nacogdoches County · Douglass W. (Travis Peak) field · Producing  · Directional

North Hayter Trust #15 (API 42-347-31954) is a well in Nacogdoches County operated by Wallace Operating Company LLC, completed January 19, 2005 and listed as producing on the RRC schedule, shut in September 1, 2024.

The RRC has issued one drilling permit, issued August 23, 2004, permitted to 10,733 ft.

It was permitted by Samson Lone Star LP and has since transferred to Wallace Operating Company LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Rodessa, Bexar, James Lime, Pettit.

No lease production has been reported under this well’s leases.

Operator of record

Wallace Operating Company LLC

Permitted by Samson Lone Star LP; the EWA schedule now lists a different operator.

Based in
Metairie, LA
P-5 status
Delinquent (D)
P-5 last filed
Dec 2, 2024
Phone
(504) 504-9973

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWallace Operating Company LLC
Production reportsTeam Operating, L.L.C.through Aug 2024
Latest permitSamson Lone Star LPAug 23, 2004

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,733
total depth, ft
1
permits on file
Aug 23, 2004
last permit issued
Jan 19, 2005
completed
0
cumulative oil, bbl
1.46M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 2005 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 19, 2005
Shut in
Sep 1, 2024
Plugged
—

Operator's P-5 on the schedule: Delinquent (D)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
North Hayter Trust G-6-207851Douglass, W. (Travis Peak)Wallace Operating Company LLC101.46MJan 2005 – Jul 2026

Gas, mcf lease total

Last 12 months 0 · prior 12 328(-100%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Samson Lone Star LPJan 2005 → Jun 2007
  2. 2Samson Lone Star, LLCJul 2007 → Sep 2017
  3. 3Rockcliff Energy Operating LLCOct 2017 → Aug 2023
  4. 4Team Operating, L.L.C.Sep 2023 → Aug 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
549968-99DrillSamson Lone Star LPAug 23, 2004Aug 23, 2004—12,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 19, 2005North Hayter Trust G-6-207851Douglass W. (Travis Peak)Wallace Operating Company LLCProducing · shut in Sep 1, 202410,733

Formation tops

As filed on W-2/G-1. Subsea from 358 ft elevation.Download CSV →

FormationMD ftSubsea
Rodessa8,076-7,718
Bexar8,324-7,966
James LimeJAMES8,598-8,240
Pettit8,871-8,513

Perforations

Perforated and open-hole intervals.

FromToType
9,5059,834Perforated
10,03410,558Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,68612.251,100 S
4.510,7338.751,095 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 14, 2005Feb 22, 2005Yes
00Apr 29, 2005——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/34731954, documented in the API reference.