TEXAS · WELLS · NACOGDOCHES COUNTY · SHARTLE FARMS LEASE · API 42-347-32022 · DISTRICT 06

Shartle Farms #2

Y

Nacogdoches County · Nacogdoches NW (Travis Peak) field · Producing  · Vertical

Shartle Farms #2 (API 42-347-32022) is a well in Nacogdoches County operated by Texian Operating Company LLC, completed June 29, 2005 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued March 15, 2005, permitted to 10,575 ft.

It was permitted by Samson Lone Star LP and has since transferred to Texian Operating Company LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Rodessa, Bexar, James Lime, Pettit.

No lease production has been reported under this well’s leases.

Operator of record

Texian Operating Company LLC

Permitted by Samson Lone Star LP; the EWA schedule now lists a different operator.

Based in
Irving, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jun 12, 2026
Phone
(817) 633-7777

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTexian Operating Company LLC
Production reportsTexian Operating Company, LLCthrough Dec 2025
Latest permitSamson Lone Star LPMar 15, 2005

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,575
total depth, ft
2
permits on file
Mar 15, 2005
last permit issued
Jun 29, 2005
completed
0
cumulative oil, bbl
810K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 2005 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 29, 2005
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Shartle Farms G-6-216424Nacogdoches, NW (Travis Peak)Texian Operating Company, LLC10810KJun 2005 – Jul 2026

Gas, mcf lease total

Last 12 months 460 · prior 12 5,724(-92%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Samson Lone Star LPJun 2005 → Jun 2007
  2. 2Samson Lone Star, LLCJul 2007 → Sep 2017
  3. 3Rockcliff Energy Operating LLCOct 2017 → Aug 2023
  4. 4Team Operating, L.L.C.Sep 2023 → Aug 2024
  5. 5Texian Operating Company, LLCSep 2024 → Dec 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
559039-98DrillSamson Lone Star LPJul 18, 2005Mar 15, 2005May 20, 200510,500
559039-99DrillSamson Lone Star LPMar 15, 2005Mar 15, 2005May 20, 200510,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 29, 2005Shartle Farms G-6-216424Nacogdoches NW (Travis Peak)Texian Operating Company LLCProducing10,575

Formation tops

As filed on W-2/G-1. Subsea from 462 ft elevation.Download CSV →

FormationMD ftSubsea
Rodessa8,062-7,600
Bexar8,312-7,850
James LimeJAMES8,568-8,106
Pettit8,830-8,368

Perforations

Perforated and open-hole intervals.

FromToType
9,4009,893Perforated
10,10410,414Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,88112.251,125 S
4.510,5717.8751,230 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 6, 2006Dec 13, 2005Yes
00Jun 15, 2006——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/34732022, documented in the API reference.