WELL · 42-347-32299 · DISTRICT 6

BRG Gas Unit SWD #1

WaterN

Nacogdoches County  · Vertical

Brg Gas Unit Swd #1 (API 42-347-32299) is a former disposal or injection well in Nacogdoches County, last operated by Chesapeake Operating, Inc.; its UIC permit is no longer active.

The RRC has issued one drilling permit, issued May 22, 2006, permitted to 6,000 ft.

Operator of record

Chesapeake Operating, Inc.

Based in
Oklahoma City, OK
P-5 status
Delinquent (D)
P-5 last filed
Dec 10, 2024
Permits on file
13,061
Phone
(405) 935-3100

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitChesapeake Operating, Inc.May 22, 2006
6,000
total depth, ft
1
permits on file
May 22, 2006
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
619696-99DrillChesapeake Operating, Inc.May 22, 2006May 22, 2006—6,000

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Dec 2008
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000096675W-14 DisposalCanceled Mar 31, 200920,0001,9833,967–4,307

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120072008

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/34732299, documented in the API reference.