TEXAS · WELLS · NACOGDOCHES COUNTY · WILLIAMS GAS UNIT LEASE · API 42-347-32300 · DISTRICT 06

Williams Gas Unit #2

Shut in

Nacogdoches County · Naconiche Creek (Rod.-TP Cons.) field · Producing  · Vertical

Williams Gas Unit #2 (API 42-347-32300) is a well in Nacogdoches County operated by Weatherly Oil & Gas LLC, completed January 10, 2007 and listed as producing on the RRC schedule, shut in October 1, 2019.

The RRC has issued one drilling permit, issued August 21, 2006, permitted to 9,300 ft.

It was permitted by Chesapeake Operating, Inc. and has since transferred to Weatherly Oil & Gas LLC on the wellbore schedule.

Completion filings report 6 formation tops, including Rodessa, Bexar, James Lime, Pine Island.

No lease production has been reported under this well’s leases.

Operator of record

Weatherly Oil & Gas LLC

Permitted by Chesapeake Operating, Inc.; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Delinquent (D)
P-5 last filed
Aug 10, 2018
Permits on file
5
Phone
(512) 892-8930

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWeatherly Oil & Gas LLC
Production reportsWeatherly Oil & Gas, LLCthrough Sep 2019
Latest permitChesapeake Operating, Inc.Aug 21, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,300
total depth, ft
1
permits on file
Aug 21, 2006
last permit issued
Jan 10, 2007
completed
0
cumulative oil, bbl
253K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 2007 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 10, 2007
Shut in
Oct 1, 2019
Plugged
—

Operator's P-5 on the schedule: Delinquent (D)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Williams Gas Unit G-6-225855Naconiche Creek (Rod.-TP Cons.)Weatherly Oil & Gas, LLC10253KJan 2007 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chesapeake Operating, Inc.Jan 2007 → Oct 2014
  2. 2Chesapeake Operating, L.L.C.Nov 2014 → Dec 2014
  3. 3SND Operating, L.L.C.Jan 2015 → Jul 2017
  4. 4Weatherly Oil & Gas, LLCNov 2017 → Sep 2019

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
619835-99DrillChesapeake Operating, Inc.May 24, 2006Aug 21, 2006Oct 5, 200612,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 10, 2007Williams Gas Unit G-6-225855Naconiche Creek (Rod.-TP Cons.)Weatherly Oil & Gas LLCProducing · shut in Oct 1, 20199,300

Formation tops

As filed on W-2/G-1. Subsea from 345 ft elevation.Download CSV →

FormationMD ftSubsea
Rodessa6,614-6,269
Bexar6,971-6,626
James Lime7,112-6,767
Pine Island7,318-6,973
Pettit7,374-7,029
Travis Peak7,968-7,623

Perforations

Perforated and open-hole intervals.

FromToType
7,9868,138Perforated
8,3218,564Perforated
8,7049,122Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,87512.25725 S
4.59,3048.751,035 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 14, 2007Mar 13, 2007Yes
00Apr 10, 2007——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/34732300, documented in the API reference.