TEXAS · WELLS · NAVARRO COUNTY · API 42-349-30709 · DISTRICT 05

Mobil Oil Co. #12

Plugged

Navarro County · Corsicana (Shallow) field  · Vertical

Mobil Oil CO. #12 (API 42-349-30709) is a plugged well in Navarro County, plugged May 1, 1984, last operated by Lgm Enterprises.

The RRC has issued one drilling permit, issued December 2, 1977, permitted to 1,400 ft.

It was permitted by Navarro Enterprises, Inc. and has since transferred to Lgm Enterprises on the wellbore schedule.

Operator of record

LGM Enterprises

Permitted by Navarro Enterprises, Inc.; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Inactive (I)
P-5 last filed
May 25, 1982
Permits on file
6
Phone
(214) 696-0311

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleLGM Enterprises
Production reportsnone
Latest permitNavarro Enterprises, Inc.Dec 2, 1977

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,400
total depth, ft
1
permits on file
Dec 2, 1977
last permit issued
Jul 31, 1964
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 31, 1964
Shut in
—
Plugged
May 1, 1984

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
13250-99DrillNavarro Enterprises, Inc.Dec 2, 1977Dec 2, 1977—1,400

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 31, 1964Mobil Oil Co. O-5-1702Corsicana (Shallow)LGM EnterprisesPlugged—

Perforations

Perforated and open-hole intervals.

FromToType
1,1001,259Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.51,320——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 12, 1984Nov 21, 1977—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Mar 1985
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000005301UIC PermitPlugged May 1, 1984000–0

MONTHLY INJECTED, BBL · H-10 · LAST 11 REPORTED MONTHS

Last 12 months 0

011985

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/34930709, documented in the API reference.