TEXAS · WELLS · NAVARRO COUNTY · NAVARRO COLLEGE LEASE · API 42-349-30775 · DISTRICT 05

Navarro College #1

Plugged

Navarro County · Wildcat field  · Vertical

Navarro College #1 (API 42-349-30775) is a plugged well in Navarro County, plugged December 1, 1993, last operated by Navarro College Energy Dev..

The RRC has issued one drilling permit, issued July 13, 1978, permitted to 3,000 ft.

Operator of record

Navarro College Energy Dev.

Based in
Corsicana, TX
P-5 status
Inactive (I)
P-5 last filed
Jun 23, 1986
Permits on file
2
Phone
(903) 874-6501

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleNavarro College Energy Dev.
Production reportsnone
Latest permitNavarro College Energy Dev.Jul 13, 1978
3,000
total depth, ft
1
permits on file
Jul 13, 1978
last permit issued
Nov 1, 1978
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 1994

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 1, 1978
Shut in
—
Plugged
Dec 1, 1993

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Navarro College O-5-2112WildcatNavarro College Energy Dev.200Jan 1993 – Jan 1994

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
28397-99DrillNavarro College Energy Dev.Jul 13, 1978Jul 13, 1978Aug 30, 19783,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 1, 1978Navarro College O-5-2112WildcatNavarro College Energy Dev.Plugged—

Perforations

Perforated and open-hole intervals.

FromToType
—2,454Perforated

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/34930775, documented in the API reference.