TEXAS · WELLS · NAVARRO COUNTY · KERR 1 & 2 LEASE · API 42-349-30910 · DISTRICT 05

Kerr 1 & 2 #20R-W

Plugged

Navarro County · Corsicana (Shallow) field  · Vertical

Kerr 1 & 2 #20R-W (API 42-349-30910) is a plugged well in Navarro County, plugged October 1, 1994, last operated by Dry Creek Operating LLC.

The RRC has issued one drilling permit, issued August 1, 1979, permitted to 850 ft.

It was permitted by Crown Central Petroleum Corp. and has since transferred to Dry Creek Operating LLC on the wellbore schedule.

Completion filings report one formation top, including Nacatoch.

Its lease has reported 3.21K barrels of oil and 4 mcf of gas since January 1993, with no volume in the three years through April 2026. The lease carries 54 wells, so these are lease totals, not this well alone.

Operator of record

Dry Creek Operating LLC

Permitted by Crown Central Petroleum Corp.; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active – Extension (X)
P-5 last filed
Apr 22, 2026
Permits on file
16
Phone
(817) 224-2280

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleDry Creek Operating LLC
Production reportsDry Creek Operating, LLCthrough Mar 2022
Latest permitCrown Central Petroleum Corp.Aug 1, 1979

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

850
total depth, ft
1
permits on file
Aug 1, 1979
last permit issued
Aug 19, 1979
completed
3.21K
cumulative oil, bbl
4
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 1994 THROUGH Mar 2022

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 19, 1979
Shut in
—
Plugged
Oct 1, 1994

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 54 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Kerr 1 & 2 O-5-284Corsicana (Shallow)Dry Creek Operating, LLC543.21K4Jan 1993 – Mar 2022

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1American Eagle Resources, Inc.Mar 1994 → May 1994
  2. 2Rife Oil Properties, Inc.Jul 1994 → Dec 2004
  3. 3Texas M.O.R., Inc.Oct 2005 → Aug 2009
  4. 4Reostar Operating IncorporatedSep 2009 → Sep 2012
  5. 5Azteca Petroleum, LLCOct 2012 → Mar 2022

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
54149-99DrillCrown Central Petroleum Corp.Aug 1, 1979Aug 1, 1979Aug 13, 1979850

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 19, 1979Kerr 1 & 2 O-5-284Corsicana (Shallow)Dry Creek Operating LLCPlugged—

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Nacatoch757

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
2.8757945.2590 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Mar 7, 1985Jul 6, 1983—
00Mar 5, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
6.37K
bbl, all reported
Mar 1995
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000057463H-1 InjectionPlugged Dec 7, 199450375757–767

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0119941995

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/34930910, documented in the API reference.