WELL · 42-349-33216 · DISTRICT 5

Weed A #1

Plugged

Navarro County · Roundhouse (Haynesville) field  · Vertical

Weed A #1 (API 42-349-33216) is a plugged well in Navarro County, plugged May 29, 2020, last operated by Marathon Oil Company.

The RRC has issued 2 drilling permits between 1983 and 1993, permitted to 11,500 ft.

Completion filings report 7 formation tops, including Paluxy, Glen Rose, Rodessa, Pettit.

Its 2 leases have reported 81.1K barrels of oil and 174K mcf of gas since January 1993, last reporting in March 2021. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Marathon Oil Company

Based in
Houston, TX
P-5 status
Delinquent (D)
P-5 last filed
Aug 14, 2025
Permits on file
3,707
Phone
(281) 293-1000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMarathon Oil Company
Production reportsCl&f Operating LLCthrough Oct 2015
Latest permitMarathon Oil CompanyJan 15, 1993

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,500
total depth, ft
2
permits on file
Jan 15, 1993
last permit issued
May 31, 1983
completed
81.1K
cumulative oil, bbl
174K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2021

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 31, 1983
Shut in
—
Plugged
May 29, 2020

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Weed "A" O-5-3444Pan Ware (Rodessa)Cl&f Operating LLC181.1K174KJan 1993 – Mar 2021
Weed "A" G-5-106036Roundhouse (Haynesville)Marathon Oil Company100Jan 1993 – Jun 1993

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Marathon Oil CompanyJan 1993 → May 1995
  2. 2Map Production Co., Inc.Jun 1995 → Feb 2005
  3. 3Samson Lone Star LPMar 2005 → Jun 2007
  4. 4Samson Lone Star, LLCJul 2007 → Nov 2009
  5. 5Ironwood Oil & Gas LLCDec 2009 → Jun 2014
  6. 6Cl&f Operating LLCJul 2014 → Mar 2015

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
408042-99RecompletionMarathon Oil CompanyJan 11, 1993Jan 15, 1993Oct 26, 199210,847
191777-99DrillTXO Production Corp.Apr 15, 1983Apr 15, 1983—11,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-5-106036————
—— O-5-3444————

Formation tops

As filed on W-2/G-1. Subsea from 334 ft elevation.Download CSV →

FormationMD ftSubsea
Paluxy5,165-4,831
Glen Rose5,355-5,021
Rodessa6,427-6,093
Pettit6,972-6,638
Travis Peak7,100-6,766
Bossier10,020-9,686
CV Lime10,610-10,276

Perforations

Perforated and open-hole intervals.

FromToType
6,4526,456Perforated
10,64310,750Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
1610020225 S
8.6254,225111,155 S
2.87510,595——
5.510,8477.8751,500 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 7, 1993Dec 31, 1992Yes
00May 14, 1993——
00Jan 12, 1984Jul 11, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/34933216, documented in the API reference.