WELL · 42-349-33764 · DISTRICT 5

Sessions #2

Plugged

Navarro County  · Vertical

Sessions #2 (API 42-349-33764) is a plugged well in Navarro County, plugged July 14, 1984, last operated by Txo Production Corp..

The RRC has issued 2 drilling permits between 1984 and 1988, permitted to 4,300 ft.

Operator of record

TXO Production Corp.

Based in
Dallas, TX
P-5 status
Inactive (I)
P-5 last filed
Nov 2, 1990
Permits on file
3,227
Phone
(214) 954-2086

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitTXO Production Corp.Nov 2, 1988
4,300
total depth, ft
2
permits on file
Nov 2, 1988
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Jul 14, 1984

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
352843-99ReenterTXO Production Corp.Oct 31, 1988Nov 2, 1988—4,082
241464-99DrillHinton Production CompanyJun 7, 1984Jun 7, 1984—4,300

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Mar 1995
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000082270W-14 DisposalCanceled Jan 10, 20141,5001,5003,710–4,025

MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS

Last 12 months 0

011995

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/34933764, documented in the API reference.