TEXAS · WELLS · NAVARRO COUNTY · API 42-349-34872 · DISTRICT 05
Howell Mildred Etal #1
Navarro County · Trinidad S. (Rodessa) field · Vertical
Howell Mildred Etal #1 (API 42-349-34872) is a plugged well in Navarro County, plugged November 24, 2008, last operated by Brammer Engineering Inc..
The RRC has issued one drilling permit, issued September 12, 2008, permitted to 7,600 ft.
It was permitted by Brammer Engineering, Inc. and has since transferred to Brammer Engineering Inc. on the wellbore schedule.
Operator of record
Brammer Engineering Inc.
Permitted by Brammer Engineering, Inc.; the EWA schedule now lists a different operator.
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | Brammer Engineering, Inc.Sep 12, 2008 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,600
- total depth, ft
- 1
- permits on file
- Sep 12, 2008
- last permit issued
- —
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Nov 24, 2008
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 669738-99 | Drill | Brammer Engineering, Inc. | Aug 25, 2008 | Sep 12, 2008 | Nov 8, 2008 | 7,600 |
Well logs
1 log loaded from the RRC's log index, the latest received Apr 2, 2009. Resistivity. These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.
Open the RRC's log search for this well ↗| Logas described | Files | Intervalft, as filed | Datereceived | SizeMB |
|---|---|---|---|---|
| RESISTIVITY | TIFF | 1,070 to 7,597 | Apr 2, 2009run Nov 21, 2008 | 12.2 |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-349-34872 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-349-34872 → scanned completion filings
The logs loaded for this well are under Well logs, with the RRC's log search for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/34934872, documented in the API reference.