TEXAS · WELLS · NEWTON COUNTY · JOSHUA-BLACKSTONE LEASE · API 42-351-30703 · DISTRICT 03

Joshua-Blackstone #1

Plugged

Newton County · Bon Weir (11 100) field  · Vertical

Joshua-Blackstone #1 (API 42-351-30703) is a plugged well in Newton County, plugged June 22, 2019, last operated by Prime Operating Company.

The RRC has issued one drilling permit, issued June 9, 2000, permitted to 11,800 ft.

It was permitted by Pmo and has since transferred to Prime Operating Company on the wellbore schedule.

Its lease has reported 34 mcf of gas since April 2004, with no volume in the three years through April 2026.

Operator of record

Prime Operating Company

Permitted by Pmo; the EWA schedule now lists a different operator.

Based in
Midland, TX
P-5 status
Active (A)
P-5 last filed
Jan 29, 2026
Permits on file
595
Phone
(432) 682-5600

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePrime Operating Company
Production reportsPrime Operating Companythrough Mar 2013
Latest permitPmoJun 9, 2000

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,800
total depth, ft
1
permits on file
Jun 9, 2000
last permit issued
Sep 9, 2000
completed
0
cumulative oil, bbl
34
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 2013 THROUGH Mar 2013

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 9, 2000
Shut in
—
Plugged
Jun 22, 2019

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Joshua-Blackstone O-3-24837Bon Weir (11,100)Prime Operating Company1034Apr 2004 – Mar 2013

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
495990-99DrillPmoJun 9, 2000Jun 9, 2000Jul 12, 200011,800

Completions

CompletedLeaseFieldOperatorStatusDepth
Sep 9, 2000Joshua-Blackstone O-3-24837Bon Weir (11 100)Prime Operating CompanyPlugged—

Perforations

Perforated and open-hole intervals.

FromToType
10,66610,686Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6254,80012.25385 S
5.511,4907.8751,035 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Oct 5, 2006Apr 14, 2006Yes
00Apr 26, 2006——

Well logs

1 log loaded from the RRC's log index, the latest received Oct 6, 2006. Density, Neutron, Resistivity. These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.

Open the RRC's log search for this well ↗
Logas describedFiles Intervalft, as filedDatereceivedSizeMB
Combination: Resistivity/Neutron Density PorosityDUAL INDUCTION FOCUSED COMPENSATED Z-DENSILOGTIFF4,802 to 11,503Oct 6, 2006run Aug 5, 2000—

Find logs withinmiles of this well:List →Map →

Search the well logs loaded into Petrora →

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

The logs loaded for this well are under Well logs, with the RRC's log search for it.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35130703, documented in the API reference.