WELL · 42-353-30835 · DISTRICT 7

Davis Charlie #1

Plugged

Nolan County · Group (Canyon) field  · Vertical

Davis Charlie #1 (API 42-353-30835) is a plugged well in Nolan County, plugged January 13, 1983, last operated by Getty Oil CO..

The RRC has issued 2 drilling permits between 1979 and 1982, permitted to 6,800 ft.

Operator of record

Getty Oil Co.

Based in
Midland, TX
P-5 status
Inactive (I)
P-5 last filed
Mar 27, 1989
Permits on file
1,564
Phone
(432) 688-4100

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitGetty Oil Co.Jun 29, 1982
6,800
total depth, ft
2
permits on file
Jun 29, 1982
last permit issued
Feb 28, 1980
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 28, 1980
Shut in
—
Plugged
Jan 13, 1983

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
165079-99RecompletionGetty Oil Co.Jun 29, 1982Jun 29, 1982—4,100
63095-99DrillGetty Oil Co.Nov 7, 1979Nov 7, 1979Jan 4, 19806,800

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 28, 1980Davis Charlie O-8-15899Group (Canyon)Getty Oil Co.Plugged—

Perforations

Perforated and open-hole intervals.

FromToType
5176,712Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62546712.25300 S
2.3755,654——
5.57,0537.8751,200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984Apr 22, 1980—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35330835, documented in the API reference.