WELL · 42-353-31503 · DISTRICT 7
Arledge Ranch #2
Nolan County · Yellow Wolf (Odom Lime) field · Vertical
Arledge Ranch #2 (API 42-353-31503) is a plugged well in Nolan County, plugged May 6, 2010, last operated by Finley Resources Inc..
The RRC has issued one drilling permit, issued September 6, 1983, permitted to 6,800 ft.
It was permitted by Puma Exploration Company and has since transferred to Finley Resources Inc. on the wellbore schedule.
Completion filings report 3 formation tops, including Canyon, Gardner, Odom Lime.
Operator of record
Permitted by Puma Exploration Company; the EWA schedule now lists a different operator.
Fort Worth, TX · P-5 Y, filed Sep 4, 2025 · 276 permits on file · (817) 231-8773
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Finley Resources Inc. |
| Production reports | none |
| Latest permit | Puma Exploration CompanySep 6, 1983 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,800
- total depth, ft
- 1
- permits on file
- Sep 6, 1983
- last permit issued
- Feb 6, 1984
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2019
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 6, 1984
- Shut in
- —
- Plugged
- May 6, 2010
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Arledge Ranch O-8-21161 | Yellow Wolf (Odom Lime) | Finley Resources, Inc. | 2 | 0 | 0 | Jan 1993 – Aug 2019 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 210143-99 | Drill | Puma Exploration Company | Sep 9, 1983 | Sep 6, 1983 | — | 6,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-21161 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,339 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Canyon | 5,370 | -3,031 |
| Gardner | 6,460 | -4,121 |
| Odom Lime | 6,760 | -4,421 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,760 | 6,766 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 305 | 12.25 | 300 S |
| 4.5 | 6,947 | 7.875 | 300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 23, 1988 | May 10, 1988 | — |
| 00 | Jun 15, 1984 | Mar 14, 1984 | — |
| 00 | Jun 12, 1984 | Mar 14, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-353-31503 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-353-31503 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 1.24M
- bbl, all reported
- Nov 2009
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000064619 | H-1 Injection | Plugged May 17, 2010 | 500 | 2,000 | 6,760–6,766 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 23,925(-100%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/35331503, documented in the API reference.