WELL · 42-353-32116 · DISTRICT 7
Adams J.G. #1
Nolan County · Group West (Ellenburger) field · Horizontal
Adams J.G. #1 (API 42-353-32116) is a horizontal well in Nolan County operated by Dunagin Transport Company, completed May 31, 1990.
The RRC has issued 2 drilling permits (amended once) between 1989 and 2013, permitted to 9,900 ft.
Completion filings report 11 formation tops, including Coleman Junction, Saddle Creek, Breckenridge, Cisco.
Its 2 leases have reported 27.2K barrels of oil and 32.1K mcf of gas since January 1993, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.
It holds an active disposal or injection permit, with 53.5K barrels injected in the 12 months reported through November 2025.
Operator of record
Abilene, TX · P-5 Y, filed Jan 4, 2026 · 4 permits on file · (325) 928-5253
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Dunagin Transport Company |
| Production reports | Mystic Green Earth Resources Incthrough Oct 2006 |
| Latest permit | Dunagin Transport CompanyFeb 25, 2013 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,900
- total depth, ft
- 3
- permits on file
- Feb 25, 2013
- last permit issued
- May 31, 1990
- completed
- 27.2K
- cumulative oil, bbl
- 32.1K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 31, 1990
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| J.G. Adams O-8-31222 | Maryneal, East (Canyon) | D.K.D. | 1 | 0 | 0 | Apr 2013 – Jul 2026 |
| Adams, J.G. O-8-25680 | Group West (Ellenburger) | Dunagin Transport Company | 1 | 27.2K | 32.1K | Jan 1993 – Jun 2014 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Oryx Energy CompanyJan 1993 → Oct 1994
- 2Samson Resources CompanyNov 1994 → Mar 1995
- 3Samson Hydrocarbons CompanyApr 1995 → Jul 1996
- 4Samson Lone Star LPAug 1996 → Nov 1999
- 5Permian Resources, Inc.Dec 1999 → May 2002
- 6Agri-Plex Operating, Inc.Sep 2003 → Sep 2005
- 7Mystic Green Earth Resources IncJul 2006 → Oct 2006
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 757085-99 | Recompletion | Dunagin Transport Company | Feb 19, 2013 | Feb 25, 2013 | Mar 1, 2013 | 5,050 |
| 364165-98 | Drill | Oryx Energy Company | Jan 22, 1990 | Sep 20, 1989 | — | 9,900 |
| 364165-99 | Drill | Oryx Energy Company | Sep 20, 1989 | Sep 20, 1989 | — | 9,900 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-25680 | — | — | — | — |
| — | — O-8-31222 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,565 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Coleman Junction | 3,250 | -685 |
| Saddle Creek | 3,948 | -1,383 |
| Breckenridge | 4,000 | -1,435 |
| Cisco | 4,030 | -1,465 |
| Canyon | 4,297 | -1,732 |
| Gunsite Lime | 4,460 | -1,895 |
| Cook | 4,900 | -2,335 |
| Cook | 4,994 | -2,429 |
| Gardner Lime | 6,392 | -3,827 |
| Odom | 6,678 | -4,113 |
| Caddo | 6,903 | -4,338 |
| Ellenburger | 7,019 | -4,454 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,000 | 5,002 | Perforated |
| 7,031 | 7,048 | Perforated |
| 7,570 | 9,180 | Perforated |
| 9,209 | 9,212 | Open hole |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 439 | 12.25 | 415 S |
| 7 | 7,556 | 8.375 | 1,808 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 5, 2013 | May 20, 2013 | — |
| 00 | Jul 27, 1990 | Jun 22, 1990 | — |
| 00 | Feb 5, 1990 | Dec 29, 1989 | Yes |
| 00 | Jan 31, 1990 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-353-32116 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-353-32116 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 53.5K
- bbl, last 12 reported months
- 2.58M
- bbl, all reported
- Nov 2025
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000106823 | W-14 Disposal | Active | 25,000 | 2,000 | 4,000–5,020 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 53,542 · prior 12 83,856(-36%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/35332116, documented in the API reference.