WELL · 42-353-32370 · DISTRICT 7
Jordan #1
Nolan County · Blackwell N. (Jenn. Lime) field · Vertical
Jordan #1 (API 42-353-32370) is a plugged well in Nolan County, plugged August 15, 2011, last operated by Hurst Oil & Gas Inc..
The RRC has issued one drilling permit, issued November 15, 1995, permitted to 5,700 ft.
It was permitted by Rendova Oil Company, Inc. and has since transferred to Hurst Oil & Gas Inc. on the wellbore schedule.
Completion filings report 6 formation tops, including Coleman Junction, Canyon, Palo Pinto, Strawn.
Its lease has reported 6.76K barrels of oil and 42.8K mcf of gas since January 1996, last reporting in February 2012.
Operator of record
Permitted by Rendova Oil Company, Inc.; the EWA schedule now lists a different operator.
Hillsboro, TX · P-5 Y, filed Apr 4, 2025 · 1 permits on file · (254) 315-4127
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hurst Oil & Gas Inc. |
| Production reports | Rendova Oil Company, Inc.through Jul 2000 |
| Latest permit | Rendova Oil Company, Inc.Nov 15, 1995 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,700
- total depth, ft
- 1
- permits on file
- Nov 15, 1995
- last permit issued
- Jan 7, 1996
- completed
- 6.76K
- cumulative oil, bbl
- 42.8K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1996 THROUGH Feb 2012
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 7, 1996
- Shut in
- —
- Plugged
- Aug 15, 2011
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Jordan O-8-27768 | Blackwell, N. (Jenn. Lime) | Hurst Oil & Gas, Inc. | 1 | 6.76K | 42.8K | Jan 1996 – Feb 2012 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Rendova Oil Company, Inc.Jan 1996 → Jul 2000
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 441968-99 | Drill | Rendova Oil Company, Inc. | Nov 15, 1995 | Nov 15, 1995 | Nov 29, 1995 | 5,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-27768 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,062 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Coleman JunctionBASE COLEMAN JUNCTION | 2,740 | -678 |
| CanyonCANYON REEF | 4,336 | -2,274 |
| Palo PintoPALO PINTO LIME | 4,876 | -2,814 |
| Strawn | 5,118 | -3,056 |
| Goen Lime | 5,344 | -3,282 |
| Jennings Lime | 5,442 | -3,380 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,444 | 5,446 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 420 | 12.25 | 220 S |
| 5.5 | 5,525 | 7.875 | 125 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 18, 1996 | Feb 23, 1996 | Yes |
| 00 | Mar 1, 1996 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-353-32370 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-353-32370 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/35332370, documented in the API reference.